API Drilling Adapter Spools or Spacer Spools or Riser Flange
API 6A Standard spacer spool or adapter spool
1. Standard: API
2. Pressure:2000PSI-20000PSI
3. Size: 3 1/8"--26 3/4"
Spacer spool, in accordance with API 6A, have end connectors of the same size, rated working pressure and design. Spacer spool is wellhead sections which have no provision for suspension of tubular members and which may have no provision for sealing of tubular members
We manufacture the spacer spool in all sizes and pressure ratings suitable for Well Head extension, B.O.P. spacing, and Choke, Kill, and Production Manifold applications. spacer spool usually has the same nominal end connections. spacer spool identification consists of naming each end connection and the overall length (outside of end connection face to outside of end connection face).
High quality
Chemical material analysis spectrograph
High quality
Impact Test
High quality
Tensile Yield stength test
Factory
Workshop
We have more than 100 sets of cold and hot processing equipments, over 20 sets of inspection equipments in the workshop.
Warehouse
Our Warehouse is about 2000 square mete
Production Equipment
80H CNC and GLU16X20 Gantry CNC
Our Certifications
Ruide has got API 6A 6D 16A 16C certifications and the right to use the API monograme from 2007 for already 9 years, and also has ISO 9001 14001 OHSAS 18001 certifications and could provide DNV GL ABS certification as requirement.
Packing Details : Plywood case as per international standard
Delivery Details : 20 - 60 days after order (According to total quantity of products)
Our clients from Egpty visit our company on January, 2016.
The production director from USA National Oilwell Varco (NOV) inspects the products in our workshop.
Our clients from Cuba inspect the wellhead equipments for shipment in our company on January, 2016
Q: Are you trading company or manufacturer ?
A: We are one of the professional manufacturer for many years for petroleum machinery .
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-45 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
Send Inquiry to This Supplier
You May Also Like
-
GH4133 GH4133B GH4163 High Temperature Alloy Forgings High Strength Forged Flange RingNegotiableMOQ: 100 Pieces
-
ANSI 316L Inlet Flange Forged Stainless Steel FlangeUS$ 39MOQ: 1 Piece
-
Precision Electrical Pure Iron Forging for Transformers and Inductors in Power IndustryNegotiableMOQ: 1 Ton
-
OEM Factory Stainless Steel Ring Forging Parts Stainless Steel Hot Forged TitaniumNegotiableMOQ: 1 Ton
-
Plastic Flange Protector End Cap Flange Protective CoverNegotiableMOQ: 100 Pieces
-
With Machining Surface Reusable Metal Casting Mechanical PartsNegotiableMOQ: 100 Pieces
-
High-precision Carbon Steel Flange Customization Large Diameter Stainless Steel Flanging Butt Welding Flange Carbon Steel Flat Welding FlangeUS$ 1.5 - 100MOQ: 1 Piece
-
CNC Machining Parts Ductile Iron Material of Construction Engineering Fittings Parts FastenerUS$ 1 - 2MOQ: 1000 Kilograms
-
Forged OEM ComponentsUS$ 0.1 - 0.1MOQ: 100 Pieces
-
Metal Pipe Flange for 25mm Suqre PipeUS$ 0.6 - 1.5MOQ: 1000 Pieces



















