erw hot dip galvanized scaffolding tube,erw scaffold tube
| Description | Scaffolding Pipe/Scaffold Tube |
| Technique | ERW |
| Surface Treatment | bare/ painting(varnished)/ galvanized |
| Outside Diameter | OD48mm/48.3mm/1.5inch |
| Wall Thickness | 2.5mm, 2.75mm, 3.0mm, 3.2mm, 3.75mm, 4.0mm |
| Length | 5.8m,6m,6.4m; 19/20/21feet |
| Quality guarantee | accept the third party testing |
| Application | all kinds of scaffolding products, building materials |
| Delivery Time | within 20 days after receiving the deposit or L/C |
| Port of Loading | Tianjin, China |
Scaffolding Pipe Showing
Surface treatment: Bare,Painting,Varnished,hot dip galvanize.
Sample and Label Showing
Our Warehouse
Hot Dip Galvanized Steel Pipe
Zinc Coating: average 230gsm, strong anti-rust
Standard Packing: in bundles with steel strip
Our professional loading can protect goods damaged.
When you place order, our factory will produce your goods at the first time.
Prompt delivery can make you win market advantage.
Tianjin Ruijie Steel Pipe Co.,Ltd was established in 2005 and located in China famous steel pipe base - Daqiuzhuang . It attached to Ruijie Group which has fixed assets of 225 million dollars. Ruijie group company is the modernized large group company integrated steel pipe manufacture, anticorrosion & insulation, thermal company and international trade.
We mainly offer kinds of steel pipes,steel coils,steel sheets,scaffolding and nails. If you have any interest on other steel products, we would like to support you.
Q: Are you trading company or manufacturer ?
A: A: We are factory.
Q2. What is your terms of payment?
A: We can accept T/T,L/C,Alibaba trade assurance order
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF
Q4. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. What is your sample policy?
A: we could offer the sample for free charge but do not pay the cost of freight.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Send Inquiry to This Supplier
You May Also Like
-
China Stainless Steel Decorative Hollow Pipe Stainless Steel Seamless/Welded Round/Square TubeUS$ 800 - 1100MOQ: 1 Ton
-
High Temperature Seamless Pipe 1.7386 Seamless Pipe Wear Resistant High Temperature Bearing Boiler PipingNegotiableMOQ: 1 Ton
-
Advanced Food Packing Machine With Touch Screen Control for User-Friendly OperationUS$ 76.5 - 80MOQ: 10 Combos
-
Electromagnetic Pure Iron Tube for Geological Detectors Featuring Stable PerformanceNegotiableMOQ: 1 Ton
-
ASTM A312 Tp 304h High Temperature and Corrosion Resistant Seamless and Welded Stainless Steel PipeNegotiableMOQ: 1 Ton
-
Hot Selling Excellent Quality DN8-DN325 Stainless Steel PipesNegotiableMOQ: 1
-
Precision Casting Stainless Steel Y-teeUS$ 0.1 - 0.1MOQ: 100 Pieces
-
Metal Chrome 15*30 Oval TubeNegotiableMOQ: 2000 Pieces
-
Professional Ductile Iron Pipe FactoryUS$ 1 - 100MOQ: 1 Piece
-
30*30mm Double Holes Square Brushed Metal Slot Tube for Store DisplayNegotiableMOQ: 1000 Pieces









