Steel Structure Frame Workshop/warehouse/building
This is our design artwork
This is our Three-dimensional effect chart
These are our products for Angolan curstomer.
The below warehouse we build is for Qingdao logistics enterprise
This is warehouse interior frame
This is warehouse exterior structure
We use the rolling-up door
Qingdao Zhongbo Steel Structure Co.,Ltd. possesses professional large_scale steel structure production equipments and the automatic spraying production line, so we can satisfy the different customers demand. We takes “build your future” as mission and takes company growth as premise. The company has trained many high quality marketing personnel, professional technician and construction workers. We take the customers' demand as the guidances, then provide reasonable, scientific and effective solution for customers. We regard practical growth, innovation and group solidarity as our company spirit, so that we can offer all-round service to customers.
If you need we design for you, pls supply us the following parameter together with detail size:
load on roof(KN/M2), live load on second floor(KN/M2) if have
d speed(KM/H) or wind load(Kn/M2)
3.snow load (Kn/M2) if have
4.earthquake load if have
5.Size:length*width*height
5.crane (if have): crane span, crane type, crane quantity, crane lift height, max lift capacity, max wheel pressure and min wheel pressure
Delivery time
The transit time from China to most locations in Europe and the United States is roughly 29 – 35 days. However, keep in mind that it can take a few days – sometimes up to a whole week – before your cargo is loaded in the port of loading in China. The same thing is true in the Port of Destination, it usually takes 2 – 3 days before your cargo is cleared and ready for pick up.
Sea freight is indeed quite slow and this means that importing from China certainly requires a lot more long_term planning compared to domestic product purchases. This has also been a major cause for the recent surge in reshoring in Europe and the US. In general I recommend businesses to place an order at a minimum 3 months before they need the products in their warehouse.
Send Inquiry to This Supplier
You May Also Like
-
Steel Structure BuildingNegotiableMOQ: 2400 Combos
-
Steel Frame StructureUS$ 50 - 100MOQ: 300 Square Meters
-
H Section Steel Q235B Q345BUS$ 800 - 1,000MOQ: 25 Tons
-
Steel Bridge Steel Space Frame OverpassUS$ 1,200 - 1,300MOQ: 22 Tons
-
Steel Structures ProductUS$ 0.1 - 100MOQ: 1 Piece
-
Sheet Frame Structure With Good QualityUS$ 0.1 - 50MOQ: 3000 Pieces
-
30x50 Aluminum Frame Permanent Outdoor Warehouse TentUS$ 20 - 60MOQ: 1 Set
-
Rubber Tyre Gantry CraneUS$ 1 - 300,000MOQ: 1 Set
-
Steel‑structure Building、Ssteel Frame Building、teel Structure Factory BuildingsNegotiableMOQ: 500 Square Meters
-
Alloy Carburizing Steel 20crni3a Round Steel, American Standard High-quality A42202 Quenched and Tempered Round Steel, 14 - 600 CuttingUS$ 1.46 - 1.62MOQ: 10 Kilograms






