Home > Manufacturing & Processing Machinery > Building Material Making Machinery > Pipe Making Machine > Mild Steel Ventilation Duct Forming Equipment/process

Mild Steel Ventilation Duct Forming Equipment/process

Mild Steel Ventilation Duct Forming Equipment/process photo-1
Mild Steel Ventilation Duct Forming Equipment/process photo-2
Mild Steel Ventilation Duct Forming Equipment/process photo-3
Mild Steel Ventilation Duct Forming Equipment/process photo-4
Mild Steel Ventilation Duct Forming Equipment/process photo-5
Mild Steel Ventilation Duct Forming Equipment/process photo-6
US$ 18,000 - 40,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Pipe Production Line
Pipe Material:
Carbon Steel
Payment & Shipping
Payment Methods:
Port of Shipment:
Tianjin
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Pipe Production Line
Pipe Material Carbon Steel
Application Drain Pipe
Production Capacity 8-10m/min
Place of Origin Hebei, China
Brand Name Zhongtuo
Model Number ZT-150
Voltage 380V,50HZ,3PH
Power(W) 3kw
Dimension(L*W*H) 17*1.2*1.4m
Weight About 7.5T, About 7.5T
Certification ISO9001,CE
Warranty 1 year
After-sales Service Provided Engineers available to service machinery overseas

 

 

 

 

                                                      

Mild steel ventilation duct forming equipment/process

 

 

 

Product Description

 Main components: Manual uncoiler, Roll forming machine, computer control  system, hydraulic 

control system, cutting system

Our products are widely used in various industrial factory, civilian building, warehouse and easy

 steel building manufacturing, and have features such as nice appearance and durable.

 

No.

Main parameter of steel pipe roll forming machine

1

Suitable to process

Color steel plate

2

Width of the plate

As customer need

3

Thickness 

0.5-0.8mm

4

De-coiler 

Manual one, can load 3 tons raw material

5

Rollers for forming 

19 rollers 

6

Diameter of the roller

Φ60mm

7

Rolling material

Carbon Steel 45#

8

Main motor power

4kw

9

Productivity

8-10m/min

10

Cutting method

mold cutting 

11

Material of the cutting blade

Cr12

12

Hydraulic cutting power 

3kw

13

Processing precision

Within 2.00mm

14

Control system

 

 Panasonic PLC control

15

Main structure of the machine

300 H steel

16

Weight 

About 7.5T

17

Dimensions

17*1.2*1.4m

18

Voltage

380V 50Hz 3phases(changeable as needs)

 

  main machine picture make a reference:

 

Mild steel ventilation duct forming equipment/process

 

sample of production:

  Mild steel ventilation duct forming equipment/process Mild steel ventilation duct forming equipment/process

 

 

 

profile to make a reference:

 

Mild steel ventilation duct forming equipment/process Mild steel ventilation duct forming equipment/process

 

 

 

 

Our Services

 

Warranty: 1 year and life-long maintainance

*Installation and debugging: We will send professional engineer to make installation and 

debugging, Buyer pay our engineer each one 50 USD/day, and provide accommodation,

 food and the round-trip ticket fee.

* Installation Days: about 5-7 days

 

 

Company Information

 

Cangzhou ZHONGTUO International Trade Co., Ltd is a professional manufacturer and exporter which has its own factory and also cooperate with several production factories and
concerning with the design, development and production of cold roll forming machines,
material of building. It is located in northwest of CangZhou, as a long history of cold roll
forming machine production base. All products comply with international quality standards
and are greatly appreciated in variety of different markets throughout the world, such as
Asia, Africa, Europe,South America, and Australia and so on.

 

Mild steel ventilation duct forming equipment/process

 

 

FAQ

 

 

1.You are trade company or factory?
- We are trade company but we also have own factories. Building trade company is just for
exporting various types of cold roll forming machines.
2. Why your price is higher than others?
- As we persist on that each factory should put quality at the first place. We spend time
and money on developing how to make machines much more automatic, accurate and high quality. We can make sure that our machine could use more than 20 years without any problem. We can provide 2 years free quality assurance.
3. How long the machine could be made?- Normally speaking, welded pipe making machine could be made without 45 working days. If you need machines in a hurry, we can make it for you less than a month.
4. How to visit your company?
-a.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5
hours), then we can pick up you.
5. Does one machine can only produce one style panel profile?
-Not exactly.For wider and double layer making machine. It can produce more than 6 kinds of
panels.
6. Do you have after sales support?
-Yes, we are happy to give advice and we also have skilled technicians available across the
world.We need your machines running in order to keep your business running.
7. What can you do if the machine broken?
-Our machine's warranty period is 12months,if the broken parts can't repair,we can send the
new parts replace the broken parts freell,but you need pay the express cost yourself.if
after warranty period,we can through negotiationfor to solve the problems,and we supply the
technical support for the whole life of the equipment.
8. Can you be responsible for transport?
-Yes,please tell me the destination port or address.we have rich experience in transport.

 

 

 

other machine

 

 

We can produce  other machine, if you have insteresting, you can enter our Web have a look.

Here is the  Connection:

 

ZHONGTUO COMPANY

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2014
Factory Size
3,000-5,000 square meters
Total Employees
51 - 100 People