CZ Interchangable Purlin Roll Forming Machine

CZ Interchangable Purlin Roll Forming Machine photo-1
CZ Interchangable Purlin Roll Forming Machine photo-2
CZ Interchangable Purlin Roll Forming Machine photo-3
CZ Interchangable Purlin Roll Forming Machine photo-4
CZ Interchangable Purlin Roll Forming Machine photo-5
CZ Interchangable Purlin Roll Forming Machine photo-6
US$ 40,000 - 50,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Work Pressure:
20Mp
Production Capacity:
20m/min
Payment & Shipping
Payment Methods:
Port of Shipment:
tianjin xingang
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Work Pressure 20Mp
Production Capacity 20m/min
Place of Origin Hebei, China
Brand Name Zhongtuo
Model Number ZT-80-100
Voltage 380V/50HZ 3Phase(as Customer's Request)
Power(W) 18.5kw+7.5kw
Dimension(L*W*H) 12.4m*1.8m*1.8m
Weight 9.8Tons
Certification ISO9001, CE
Warranty 12 Months
After-sales Service Provided Engineers available to service machinery overseas

CZ interchangable purlin roll forming machine

 

Details of each parts:

CZ interchangable purlin roll forming machine

CZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machine

 

Main parameter of CZ interchangeable roll forming machine

a. Pre-punching and cutting part

Feature : Ensure stability, precision and cutting speed

Function : Automatic cutting controlled by PLC

Material of blades: Gcr12MoV quenched

Power supply : hydraulic power

Power :7.5 kW

Frame : Pillar style with rack & pinion system

Stroke switch : non-contact photoelectric switch

 

b.Roll forming part:

1)Number of forming steps:20 steps
2)Material of shafts:45# steel, hardening and tempering,HRC40-45°  

Outer diameter:80 mm

3)Material of rollers:GCr15 or Cr12 quenched, HRC 58-60°

4)Transmission: chain

5)Forming speed:20 m/min

6)Motor:18.5 kW

7)Voltage:380V,50Hz,3 phase

8)Frame : middle plate welded

9)Dimensions:12400 x 1800 x 1800 mm

10)Weight of machine: about9.8 tons

11) Leveling: one set, seven rollers

12)Changing speed from one profile to another or from one size to another size: 25 minutes.

13)Suitable material: 1.5-3.0 mm, Q195~235 cold rolled steel, hot-zinc coil

14)Material of roller: GCr15, 40Cr, quenched, 

 

Working flow:

CZ interchangable purlin roll forming machine

 

Drawings profile:

CZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machine

 

Finished product for your reference:

 

CZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machineCZ interchangable purlin roll forming machine

 

Factory scene:

CZ interchangable purlin roll forming machine

 

sales terms

Terms of Payment: 30% of the total contract value paid by T/T as down payment, the rest 70% of the total contract value to be paid by T/T after inspection by buyer in seller’s factory while before delivery.                 

Delivery: 20 days after receipt of advance payment

Service: we sent technician to your country to fix the machine.

The buyer should bear all the cost including: visa, Roundtrip ticket and suitable accommodation, also buyer should pay the salary 80USD/day.

Warranty: 12 months limited warranty 

During warranty: parts are free but buyer pay for the shipping fee.

 

FAQ

Q: Are you manufacturer?
A: Yes, we are manufacturer and trading company.

Q: What kind of payment term you can do?

A: We are flexible about payment terms, please contact us for details.

Q: What info you need before you make the proposal for a roll forming machine?
A: The profile drawings, material informations, your special requirements.

Q: What I should do if I just start to know roll forming machinery?
A: Contact us immediately, we provide free consultant pre-sales service.

Q: How to visit our company:
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.

    2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
    3. Fly to Guangzhou aiport: By air From Guangzhou to Beijing airtpot; By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2014
Factory Size
3,000-5,000 square meters
Total Employees
51 - 100 People