Home > Metallurgy, Mineral & Energy > Steel & Products > Steel Pipe & Tube > ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe

ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe

ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe photo-1
ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe photo-2
ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe photo-3
ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe photo-4
ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe photo-5
US$ 650 - 1,156 MOQ: 2 Tons
Key Specifications
Get Latest Price
Standard:
Grade:
Thickness:
4.5, 7.1
Payment & Shipping
Payment Methods:
Port of Shipment:
Tianjin
Delivery Detail:
Delivery time depends on order quantity.
Thickness 4.5, 7.1
Section Shape Round
Outer Diameter 15 - 80 mm
Place of Origin Hebei, China
Secondary Or Not Non-secondary
Application Structure Pipe
Technique Cold Drawn
Certification Other, ISO9001
Surface Treatment Other, none
Special Pipe Thick Wall Pipe
Alloy Or Not Non-alloy

 

 

ST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe

material type:low carbon steel round billet/bar

 

Business Type

Manufacture and exporter

Product

Carbon seamless steel pipe /Alloy steel pipe 

Advantage sizes

Outside diameter

Wall thickness

Outside diameter

Wall thickness

8-80mm

1-14mm

1”-3.15”

SCH40-XXS

Material and standard

Item

Chinese Standard

American standard

Japanese Standard

German standard

1

10#

A53A

A106A

A179C

STKM11A

St37.0

St37-2

St35.8

2

20#

ASTM A106B

ASTM A53B

ASTM A178C

AISI1020

STKM12A/B/C

STKM13A/B/C

STKM19A/C

STKM20A

S20C

St45-8

St42-2

St45-4

CK22

Terms&conditions

1

Packing

in bundle by steel belt;   bevelled ends;   paint varnish;

plastic caps;           marks on the pipe.

2

Payment

T/T and L/C at sight

3

Min.Qty

10 tons per size.

4

Tolerate

OD +/-1%; Thickness:+12.5% / -10%;length:+/-2 cm

5

Delivery time

25days for the minimum order.

6

Application

Pipeline ,for conveying fluid, such as water, oil ,etc.

 

ST 37.0 Seamless Tube For Fluid Transportation Tube & PipeST 37.0 Seamless Tube For Fluid Transportation Tube & PipeST 37.0 Seamless Tube For Fluid Transportation Tube & Pipe

FAQ

 

1. How long will it take to produce an order?
It is within 30days for the purchasing and production time with container order and 10days for the sample.  

2. What is your minimum order?
Usually 5 ton for each size

3. What form of quotation do you offer?
FOB Tianjin, CIF and CNF Your destination

 

4. What is your payment term? 
Payment is 30% deposit, 70% before shipment 

 

5. Does the sample for free or not?
The samples are free if they are common sizes, You need to pay for the freight .

 

6. How do you guarantee the quality of the products?
All of our procedures are strictly operated under the ISO 9001:2008, and there are as many as 6 times of test during the production of each product to ensure the quality.

 

7. How do you to package the product?
Wrapped with polywoven bags, we use steel belt to pack the outside, polywooden cases or wooden boxes for thin wall thickness can be offered if required

 

8.How about the Third Party Inspection ?
We have been working with DNV,TUV,SGS,BV,CO,Lloyd's etc;

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2009
Factory Size
5,000-10,000 square meters
Total Employees
201 - 300 People