Home > Construction & Decoration > Prefabricated Building > Prefabricated Hotel > Pre Engineered Steel Building Villa

Pre Engineered Steel Building Villa

Pre Engineered Steel Building Villa photo-1
Pre Engineered Steel Building Villa photo-2
Pre Engineered Steel Building Villa photo-3
Pre Engineered Steel Building Villa photo-4
Pre Engineered Steel Building Villa photo-5
US$ 55 - 100 MOQ: 200 Square Meters
Key Specifications
Get Latest Price
Place of Origin:
Guangxi, China
Brand Name:
WG
Model Number:
T#
Payment & Shipping
Payment Methods:
Port of Shipment:
Fangcheng Port
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Guangxi, China
Brand Name WG
Model Number T#
Material Steel
Use Carport, Hotel, House, Other, Office, Shop, Toilet, Villa, Warehouse, Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa, Warehouse, Workshop,Plant, Factory

Pre engineered steel building villa

 

Pre engineered steel building villa

 

 Precast home/Modular home/Prefabricated house design/prefab accommodation/precast dormitory/modular home/ modular house building/prefabricated office/ modular office/ modular classroom/Prefabricated restaurant.

 

 

Advantage: Safe, Utility and Firm, Easy to assemble and disassemble, Easy to transport, Economy, Comfortable, Environmental.

 

 

Main material: 50/75MM EPS sandwich panels (rock wool, glass wool can be choose, panel thickness can be choice.) + light steel frame. (buyer need make concrete foundation).

 

 

Design: Design on your request.

 

 

 Application:

 

1. Widely used in building site, such as road project, railway, real estate, bridge project, dam project, power station, and mining site and so on..

 

2. Widely used for factory.

 

3. Widely used for family house for low income house, dormitory, accommodation, apartment, kitchen and so on .

 

4. Widely used for temporary house, such as temporary hospital, temporary classroom, wild temporary houses etc.

 

5. Widely used for gas station.

 

6. Widely used for villa.

 

 

 

Technology date:

 

  1. 1.       Wind against: 10-level wind
  2. 2.       Static load: 0.20 KN /m2;   Live load: 0.3 KN/m2
  3. 3.       Basic wind pressure: 0.35 KN/m2
  4. 4.       Earthquake intensity, Fortification intensity: 8 degrees for singly story
  5. 5.       Damp proof & flame proof
  6. 6.       Easy assemble, 2-3 persons can install about 100 square meter per day.

 

 

  

Assembly Period:

     

      5 people in one team. The workers must accept training first.

      100-150m2 can be finished installation per sunny day.

 

  

 

Material list as below:

  

Steel structure frame

Column

#C steel 80×40×1.9 mm 

A beam

C80×40×1.9,(C80×40×1.9),L40×3.0

Herringbone beam

C80×40×1.9,(C80×40×1.9),L40×3.0

Ground beam

C80×40×1.5 mm

Ring beam

C80×40×1.5 mm

Roof purlin

L40×3.0 mm

Horizontal beam

L40×3.0 mm

Control rod

φ8

Steel stairway

steel structure stair,3mm steel board

Railing

60×40 flat steel,L40×3.0,28 square steel,35 square steel

Floor

Second floor

15mm polywood floor

Roof panel

Roof tile

20mm PU tile/50mm EPS/ 50mm rock wool/ 50mm glass wool 

Wall panel

 wall

50mm EPS sandwich panel/50mm rock wool/ 50mm glass wool

Accessory

Door

4cm EPS sandwich panel

Window

plastic steel sliding window(1740cmx925mm) ,the thickness of glass is 4mm

nails, screws, bolts, glass cement

 

 

 

           

 

Install step as below:

 

 

Pre engineered steel building villaPre engineered steel building villa

 

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2009
Factory Size
Below 1,000 square meters
Total Employees
51 - 100 People