2015 Light Steel Structure Building Materia Steel C/Z Purlin
2015 light steel structure building materia steel C/Z purlin
Specifications
Commodity |
hot Rolled Galvanized C. Z Channel Purlin for Steel Structure |
|
Size |
Width:24-250mm Thickness: 0.3mm-14mm Height:24mm,30mm,35mm,40mm,45mm,60mm,70mm,90mm,100mm…350mm Lenth:1-12m |
Zinc Coat |
50 g-220 g/m2as clients demand |
RawMaterials |
Q235, Q345 |
spec |
183.204.195.210.232.255.272.295.315.335.375.385.395.406. |
surface |
Black painted or pre-galvanized o or hot dipped galvanized or punch hole. |
package |
Nylon belt lifting or plastic packing or in bulk, as clients demand |
Delivery time |
15-20 days after receiving your deposit or L/C. |
Payment |
TT or 100% Irrevocable LC at sight |
|
Supply |
1. Galvanized steel pipe/tube. 2. Hot dip galvanized steel pipe/tube. 3. Seamless steep pipe/tube. 4. ERW steel pipe/tube 5. Hot rolled steel pipe/tube. 6. Spiral steel pipe/tube. 7. Cold coil/strips 8. C Z shape steel/profiles. 9. Steel coils/galvanized steel coils/sheet/strips. |

Our service
1. Professional design and engineering team
Full solution for house design. We could make the design for whole house as per your requirement.
2. Procurement and Manufacture for all material for prefabricated building
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO standard, to make sure the fabrication works with high technology.
3. Site management & Installation supervision
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
1. Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!
2. Economical Solution, compare to concrete building, prefabricated building will be much more Economical
3. Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.
4. Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.
5.Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)
we are big group factory and have more than 25 years experience of steel structure workshope project The first design&Engineering Service,Excellent product and perfect Has won the praise of customers and want to cooperation with more and more friends and customer add us team .

Send Inquiry to This Supplier
You May Also Like
-
HPL Panel (clean Room)NegotiableMOQ: 100 Square Meters
-
Fiberglass Insulation Roll Width 1.2m, Density 12kg/m3 With or Without Paper/aluminum FoilNegotiableMOQ: 100 Rolls
-
304 Stainless Steel Rib Lath Price Colombia V-Ribbed Lath Expanded Mesh for Structural Reinforcement in High-Corrosion AreasUS$ 1.7 - 3.2MOQ: 1 Piece
-
Gypsum Ceiling Metal Frame, Compatible With Armstrong Ceiling Grid ComponentsNegotiableMOQ: 1000 Pieces
-
pu Wall Sandwich Panel Rigid Insulation Polyurethane Foam BoardNegotiableMOQ: 1
-
Unitized Frameless Glass Curtain WallUS$ 1 - 260MOQ: 200 Square Meters
-
Stainless Steel Stain Chrome Finished 36 Sheet Metal GaugeUS$ 1 - 30MOQ: 600 Pieces
-
Factory Direct Sale Steel Stand Coupler Scaffolding in Large StockUS$ 4 - 6MOQ: 5000 Pieces
-
ISO Access Cover Supplier Custom Made in Zhejiang China With 30 Years ExperienceUS$ 0.5 - 19.9MOQ: 500 Pieces
-
Antibacterial EPS Sandwich Panel for Prefab HouseNegotiableMOQ: 300 Square Meters








