Die Casting Mould for Car's Curved Beam
Product name: Die casting mould for car's curved beam
Type:auto die casting mould
Size:OEM Standard /can be design as your requirement
Car Make:car
Certificate:TS16949/ISO9001
Material:Grey iron, ductile iron, cast iron etc.
Packing:Carton + pallet or Plywood cases or Other package as per customer requirement Delivery: 2 weeks for samples, 4 weeks for mass production



We are specialized in kinds of automotive covering parts mould, fixture, welding tools development , auto mould production and all car parts production
Ⅰ.BRIEF INTRODUCTION
We can develop,design and produce all kinds of mechanical&automobile parts mould ,including stamping dies,die casting mould, progressive die and etc. We can also provide OEM/ODM service,design and produce all kinds of steel stamping parts of auto covering parts and body frame as well as all auto mould products.
II. MAIN PRODUCTS
CNC Precision Machined Parts
Precision Casted Parts
Forged Parts
Precision mold inserts
Metal die casting and stamping
Precision turning pieces
Mold design and making
III. MATERIAL CAPABILITIES
Carbon steel, alloy steel, stainless Steel etc.
Grey iron, ductile iron, cast iron etc.


1.OEM/ODM service
2.Good team
3.Stamping parts
4.Strict quality control system
5.Experienced with Aisa. US. and Europe
OEM & ODM by customers’ design ,quote according to your drawing and requirement.
Our engineer team manage from part drawing until shipment and check each step to make sure the final products are qualified before shipment.
Liuzhou Tongwei Machinery Co.,Ltd. has been assessed and certified as meeting the requirement of ISO/TS 16949:2009,for the manufacture of stamping parts for automobile,EXCLUSIONS:7.3 Product Design.also has been assessed and certified as meeting the requirement of ISO 9001:2008 for the design and manufacture of stamping moulds,manufacture of stamping parts for automobile.

Send Inquiry to This Supplier
You May Also Like
-
Agriculture Using Plastic Shape Moulds Heart, Star, Square, Flower Shape for Cucumber, Watermelon, StrawberryNegotiableMOQ: 500 Pieces
-
Genyond Factory 300-1000kg/h Toilet & Laundry Production Line Processing Plant Soap Making Machine Price From OilNegotiableMOQ: 1
-
OEM Customized Molded Enclosure Injection Plastic Molding For ElectronicsNegotiableMOQ: 1
-
Brand New Waterproof Pvc Flooring With Great PriceUS$ 80 - 117MOQ: 1 Piece
-
Mould For ScrubberNegotiableMOQ: 1
-
6.35mm Adjustable M2-M10 Carbon Steel Body Die Holder Wrench Set for Power ToolsUS$ 1 - 30MOQ: 640 Pieces
-
2016 Hot Selling Concrete Plastic Paving Mould for Interlock Tile MakingUS$ 1 - 5MOQ: 500 Pieces
-
ABS Fan Parts Plastic Cover ProductsUS$ 0.1 - 5MOQ: 1000 Sets
-
Standard Square Aluminium Stamping Sheet Cnc Machining PartUS$ 5 - 10MOQ: 100 Pieces
-
New Technology Wall Panel Moulding MachineUS$ 1,000 - 50,000MOQ: 1 Set




