Low Voltage AC Load Bank
Specifications
Load bank testing system has complete protection functions:Including phasing,air pressure,over-temperature,fan failure,etc.
Shanghai Lingguang Electric Apparatus Manfacturing Co.,LTD (Lingo)established in 1991.
Professional industrial electrical products -- resistance box, load box, center grounding resistance, manufacturers in domestic resistor manufacturing enterprises have higher visibility.
With nearly 150 employees, scientific and technical force is abundant, has many national patents (Example: ZX18V type resistors, patent number 03230790).
Had including CNC plate shears, CNC folding machine, CNC punching, more than 60 sets of large-scale processing equipment.
Enterprise through IS09001 quality system, ISO14001.2004 environmental management system and GB/T2800-2001 worker health and safety management system.
LINGO widely used in steel, electric power, ship, railway, electronics, and etc, the products have been exported to Japan, France, Germany, Egypt, etc.
LINGO is located in Shanghai PuDong new area, has a total area of about 9,000 square meters workshops, warehouses and office center.
Excellent ability of research development
The advanced production processing equipment
Complete production assembly processing capacity
Perfect quality guarantee system
Quickly logistic support capacity
Timely and efficient service response
Enterprising management team
With first-class product quality to win the trust of customers
With first-class marketing quality to win the confidence of users
With first-class service quality to win the satisfaction of customers
Application for load bank:
(1) Motor manufacturing: The load bank is an ideal test equipment for generator power ,the frequency,the voltage,the current,power factor and other generator parameters.Most of the generator use the diesel oil,which can cause the fuel oil unfilled,carbon deposition ,complete machine efficiency reduced when the diesel oil load is lower than 50% or in idling situation for a long time and even cause starting difficulty ,power insuffciency,oil consumption increased,finally,opening the cylinder for maintenance too early and the abandonment ,so the load bank will be generator's ideal false load.
(2)Transformer manufacturing:Measuring the transformr's parameters include rated capacity,current ,voltage ,frequency,temperture-rise and noise and so on.
Send Inquiry to This Supplier
You May Also Like
-
Endress+Hauser E+H Compact Conductivity Device Smartec CLD18-BGGENegotiableMOQ: 1 Piece
-
ASTM D5305 Fabric Strip Tensile Tester for Textile Quality Control LabsUS$ 3000 - 10000MOQ: 1 Set
-
Hydraulic Plastic Flange Connections Cover Plugs SHF SeriesUS$ 0.22 - 0.28MOQ: 2500 Pieces
-
HST Spring Dyno Friction Leakage Fatigue Testing MachineUS$ 5000 - 10000MOQ: 1 Set
-
Gates 550C 550U U550 U-550 U508 U-508 Japan Unitta U-550 Belt Tension Meter New U-508 Belt Tension Meter Upgraded Version U550US$ 1 - 900MOQ: 1 Piece
-
Analytical Balanace.scale ,weichengya Laboratory SupplierUS$ 10 - 35MOQ: 10 Sets
-
Smart MD-3051 Online Density Meter With 4-20mA OutputUS$ 2,380 - 2,500MOQ: 1 Unit
-
5W-300W Sun Simulator Watt Testing 30% Off / Xenon Lamp Sun Simulator Free Sent / Sun Simulator TestingUS$ 7,500 - 10,000MOQ: 1 Set
-
New Design Measuring Meter With Best PerforanceUS$ 1,000 - 1,200MOQ: 1 Piece
-
XK-1 Rotary Switch Life TesterNegotiableMOQ: 1 Set

