Cuplock Scaffolding System, Galvanized Ringlock Scaffolding 48.3mm, Pipe Scaffolding System Supplier's Choice
cuplock scaffolding system, galvanized ringlock scaffolding 48.3mm,
pipe scaffolding system
![]() |
![]() |
♦ Introduction of ringlock scaffolding
The ringlock scaffolding (upright scaffolding) is a kind of new type steel pipe scaffold which has self-locking function, the main components are the vertical and cross pipes. Lock joints structure is reasonable, make the scaffolding overall in three-dimensional space structure with high intensity, good overall stability, and has reliable self-locking function, can effectively improve the overall stability of the scaffold strength and safety, can better meet the needs of the construction safety.
The advantages are installing rapidly, energy saving, simple structure, stable and reliable, strong commonality, large bearing capacity, safe and efficient, not easily lost, easy to manage, easy to transport, etc.
♦ The components of tringlock scaffolding
♦ The detailed sizes of ringlock scaffolding
Name |
Ring lock scaffolding |
|
Brand |
SHUOWEI (SW) |
|
Pipe Diameter |
60, 48 mm |
|
Pipe Thickness |
3.2, 3.0 mm |
|
Cross-pipe Length |
0.6, 0.9, 1.2, 1.5, 1.8, 2 mm |
|
Vertical-pipe Length |
0.2, 0.5, 1.5, 2, 2.5, 3 mm |
|
Surface |
Painted, Hot-dip Galvanized |
|
Advantages |
Durable, fast, easy to install |
♦ The main features of ringlock scaffolding
√ In the aspect of usage consumption
The cross-pipe of the tubular scaffolding maximum length can reach 3 meters, vertical-pipe the maximum length is 3 meters, it reduces the amount of scaffolds of every square meter;
The vertical-pipe is Q345 material, support pressure rate is big, also indirectly reduce the unit square meters of steel consumption.
The tubular scaffolding can dismantle the cross-pipe early according to the engineering situation, this parts of pipes can be used to the rest of the construction, it saves the amount of material directly.
√ In the aspect of work efficiency
Common steel fasteners set-up speed of individual workers in 35m/day
bowls scaffolding’s speed is in 55m/day
ring lock scaffold speed can reach 150 m/day
√ In the aspect of consruction cost
As can be seen from the usage and efficiency, although the initial investment is relatively large, but in the amount per square meter and speed of construction, it saves a lot of material costs, working time and daily consumption.
♦ Detailed images of ringlock scaffolding
♦ Contact us for more details of ring lock tubular scaffolding
Sales representative: Maggie
Email: wang(at)
Mob & Whatsapp: +86 15933117472
Skype: dxhf-tech
Wechat: 1019812720
♦ Related Products of Tubular Scaffoldings
♦ Why choose us
1 . PROFESSIONAL
We were founded in 2009 , has almost 8 years experience for scaffoldings .
“High quality , reasonable price , best service ” is always our working principle .
2 . THE INDUSTRY STANDAR
SW work as Layer standard or others international standards to keep the high quality.
3 . MADE IN CHINA
All SW products are engineered and manufactured in China to the highest and most up-to-date specifications.
4 . DIRECT MANUFACTURER
In an industry full of imitators, SW is a true, proven and established direct manufacturer.
5 . PARTNERSHIPS
A spirit of partnership that goes well beyond conventional supplier relationships.and our products export to over 30 countries worldwide .
Sales representative: Maggie
Email: wang(at)
Mob & Whatsapp: +86 15933117472
Skype: dxhf-tech
Wechat: 1019812720
Send Inquiry to This Supplier
You May Also Like
-
ScaffoldingNegotiableMOQ: 2700 Sets
-
48.3mm Yellow Scaffold Fitting Tube Pole Top Bolt Caps Scaffolding End CapUS$ 0.04 - 0.08MOQ: 1 Piece
-
China Wholesale Top Selling Products 2015 Scaffolding Plastic Screw End CapsUS$ 0.02 - 0.02MOQ: 10000 Pieces
-
Stainless Steel Knuckle Joint PinUS$ 3 - 5MOQ: 1000 Pieces
-
High Quality Scaffolding System Accessories Scaffolding Steel PlankUS$ 8 - 12MOQ: 1000 Pieces
-
Non Sparking Safety Hand Tools Parallel Vice HardwareUS$ 629.93 - 2,050.18MOQ: 1 Unit
-
China Honglu Structure Steel TrestleUS$ 1,300 - 1,400MOQ: 22 Tons
-
Zinc Plated Forged Antiluce Drop Lock PinUS$ 0.2 - 0.3MOQ: 1000 Pieces
-
Swivel or Double Scaffold Quick CouplerUS$ 0.4 - 4MOQ: 1000 Pieces
-
Construction Powder Coated/Hot Dip Galvanized Mobile Guard Rail H Frame Scaffolding SetUS$ 59 - 99MOQ: 1 Set












