48.3mm Forging Swivel Pipe Clamps
48.3mm forging double Coupler for scaffolding fitting
We facilitate our clients with Swivel Copper Pressed, which is available in various specifications.
Min Slip Load: 12.5KN
Distortion Load: 17KN
The packing of Forged Swivel Coupler
1) Q : When can I get the quotation for my inquiry?
A: Usually the quotation will be sent to you within 8hours upon all product details being clear.
2) Q : How long is the mass production lead time?
A : Normally 10-12days. Rush order is available.
3) Q : Can I get a sample before bulk production?
A : Yes. Usually we will make a pre-production sample for your quality evaluation. The mass production will be started after we get your confirmation on this sample.
4) Q: How long can I get the pre-production sample?
A : After all details (material, sepcifications) being confirmed and the sample fees received, the sample lead time will be within 3 days and Express delivery takes around 3-4 days.
5) Q: Is the sample charge refundable?
A : Yes, normally the sample charge is refundable when you have placed you order.
Contact: Carlos
Phone: +86 15032600633(whatsapp, wechat,viber)
Email: carlos @
Send Inquiry to This Supplier
You May Also Like
-
Scaffolding PartsNegotiableMOQ: 2400 Pieces
-
Types of Scaffolding Sleeve CouplerUS$ 0.1 - 0.1MOQ: 100 Pieces
-
2016 Practical Plastic Safety Tag For Scaffolding WorkingUS$ 9 - 10MOQ: 500 Boxes
-
Forged German Type Fixed Scaffolding CouplersUS$ 1 - 1MOQ: 1000 Pieces
-
Frp Corrugated Tube for LadderUS$ 2.5 - 18MOQ: 2000 Meters
-
High Quality Arch Steel Structure TrestleUS$ 1,300 - 1,400MOQ: 22 Tons
-
Color Zinc Plated Scaffold Right Angle CouplerNegotiableMOQ: 100 Pieces
-
BS1139 Type Drop Forged Scaffolding Double CouplerUS$ 1.5 - 2.5MOQ: 1000 Pieces
-
CouplersUS$ 2 - 11MOQ: 10000 Pieces
-
LVL for Struction ScaffoldUS$ 230 - 430MOQ: 23 Cartons





