4m Powder Coating Scaffolding Shoring Props
4m powder coating scaffolding shoring props
1.Raw Material:
Q195 , Q235 ,Q345 Steel.
2.Application:
Pole prop is applied to vertically support system in the construction to support the scaffolding formwork, such as the floor construction.
3.Structure:
Pole prop is mainly made up of bottom plate,outer tube, inner tube, swivel nut,cotter pin,upper plate and the accessories of folding tripod,head jack, the structure is simple and flexible.
4.Convenient:
Pole prop is simple of the structure, so it is easy to assemble and disassemble.
5.Adjustment:
Pole prop is adjustable because of the outer tube and inner tube, the inner tube could extend and shrink in the outer tube, and then it could be adjusted according to the required height.
6.Economy:
Pole prop could be re-used, and once useless, the material could also be recovered.
7.Practical using:
Pole prop could be adjusted to required height according to the different height of the constructions.
Pole prop Specification list
Middle East Type / German Type adjustable steel props specification list:
| Modle | Adjustable Length | Outer Tube | Inner Tube | Wall Thickness |
| MSM-1427 | 1.4m-2.7m | 60mm | 48mm | 1.5mm-3.0mm |
| MSM-1627 | 1.6m-2.7m | 60mm | 48mm | |
| MSM-1832 | 1.8m-3.2m | 60mm | 48mm | |
| MSM-2035 | 2.0m-3.5m | 60mm | 48mm | |
| MSM-2134 | 2.1m-3.4m | 60mm | 48mm | |
| MSM-2240 | 2.2m-4.0m | 60mm | 48mm | |
| MSM-2439 | 2.4m-3.9m | 60mm | 48mm | |
| MSM-3050 | 3.0m-5.0m | 60mm | 48mm | |
| MSM-3055 | 3.0m-5.5m | 60mm | 48mm | |
| Surface treatment | Painted,powder coated,pre galvanized,electro galvanized,hot dip galvanized | |||
Italian type adjustable steel props specification list :
| Modle | Adjustable Length | Outer Tube | Inner Tube | Wall Thickness |
| MSI-0814 | 0.8m-1.4m | 56mm | 48mm | 1.5mm-3.0mm |
| MSI-1630 | 1.6m-3.0m | 56mm | 48mm | |
| MSI-1831 | 1.8m-3.1m | 56mm | 48mm | |
| MSI-1835 | 1.8m-3.5m | 56mm | 48mm | |
| MSI-2035 | 2.0m-3.5m | 56mm | 48mm | |
| MSI-2036 | 2.0m-3.6m | 56mm | 48mm | |
| MSI-2240 | 2.2m-4.0m | 56mm | 48mm | |
| Surface treatment | Painted,powder coated,pre galvanized,electro galvanized,hot dip galvanized | |||
Spanish type adjustable steel props specification list :
| Modle | Adjustable Length | Outer Tube | Inner Tube | Wall Thickness |
| MSS-0814 | 0.8m-1.4m | 48mm | 40mm | 1.5mm-3.0mm |
| MSS-1630 | 1.6m-3.0m | 48mm | 40mm | |
| MSS-1835 | 1.8m-3.5m | 48mm | 40mm | |
| MSS-2035 | 2.0m-3.5m | 48mm | 40mm | |
| MSS-2240 | 2.2m-4.0m | 48mm | 40mm | |
| Surface treatment | Painted,powder coated,pre galvanized,electro galvanized,hot dip galvanized | |||
Pole prop
Different type
Pole prop
Fittings
Pole prop
Surface treatment
Pole prop
Packing & Loading

Pole prop
Workshop Show:
Pole prop
Comapny Certificate :
- - - 1. Q: What's your MOQ of the Pole prop (minimum order quantity)?
A: One full container,mixed acceptable .
- - - 2. Q: What's your packing methods of the Pole prop ?
A: Packed in bundle or bulk .
- - - 3. Q: What's your payment terms of the Pole prop ?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time of the Pole prop?
A: 10-20 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,musam construction materials co.,ltd do domestic market and musam international trading co.,ltd is the subordinate company of musam construction materials co.,ltd for export business.
- - - 6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
- - - 7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/black. BS1139
(3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) steel coupler (pressed/drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
(7) screw adjustable base jack
4m powder coating scaffolding shoring props
Together,we make it better !
Send Inquiry to This Supplier
You May Also Like
-
Types of Scaffolding Sleeve CouplerUS$ 0.1 - 0.1MOQ: 100 Pieces
-
2016 Practical Plastic Safety Tag For Scaffolding WorkingUS$ 9 - 10MOQ: 500 Boxes
-
Forged German Type Fixed Scaffolding CouplersUS$ 1 - 1MOQ: 1000 Pieces
-
Frp Corrugated Tube for LadderUS$ 2.5 - 18MOQ: 2000 Meters
-
High Quality Arch Steel Structure TrestleUS$ 1,300 - 1,400MOQ: 22 Tons
-
Color Zinc Plated Scaffold Right Angle CouplerNegotiableMOQ: 100 Pieces
-
BS1139 Type Drop Forged Scaffolding Double CouplerUS$ 1.5 - 2.5MOQ: 1000 Pieces
-
CouplersUS$ 2 - 11MOQ: 10000 Pieces
-
LVL for Struction ScaffoldUS$ 230 - 430MOQ: 23 Cartons
-
Pre-galvanized Hot Galvanized Painted Adjustable Heavy or Light Steel PropUS$ 5 - 5MOQ: 100 Pieces











