Home > Electrical & Electronics > Relay & Contactor > Relay > ABB O3EX-HENF315845R2: Dual-Network Expansion for Seamless Plant Integration

ABB O3EX-HENF315845R2: Dual-Network Expansion for Seamless Plant Integration

ABB O3EX-HENF315845R2: Dual-Network Expansion for Seamless Plant Integration photo-1
ABB O3EX-HENF315845R2: Dual-Network Expansion for Seamless Plant Integration photo-2
ABB O3EX-HENF315845R2: Dual-Network Expansion for Seamless Plant Integration photo-3
ABB O3EX-HENF315845R2: Dual-Network Expansion for Seamless Plant Integration photo-4
ABB O3EX-HENF315845R2: Dual-Network Expansion for Seamless Plant Integration photo-5
US$ 3216.00 ≥1 Blade
Key Specifications
Get Latest Price
I/O Number:
ABB O3EX-HENF315845R2
Place of Origin:
America
Model Number:
ABB O3EX-HENF315845R2
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
Delivery time depends on order quantity.
I/O Number ABB O3EX-HENF315845R2
Place of Origin America
Model Number ABB O3EX-HENF315845R2
Condition NEW
Warranty One Year
Package Original Packaging
HS Code 853710
Why Engineers Keep This in Their Toolkit
  • Dual-protocol flexibility – Runs EtherNet/IP and Modbus TCP simultaneously. Saved a packaging line retrofit last month where barcode scanners (Modbus) needed to feed data to Rockwell PLCs (EtherNet/IP).

  • Hot-swap capable – Swap modules without killing production. In most cases, you'll barely notice the 200ms network blip during replacement.

  • Real-time diagnostics – Built-in LED patterns show port status at a glance. When a Tier 1 auto supplier had intermittent comms, these LEDs pinpointed a faulty cable in under 5 minutes.

  • Firmware resilience – Auto-recovers from network storms. Typically handles factory Wi-Fi interference better than older single-protocol modules.

Technical Snapshot
SpecificationDetails
Brand/ModelABB O3EX-HENF315845R2
HS Code8537.10.0000 (Programmable controller communication modules)
Power Requirements24V DC ±15%, 1.2A max (drawn from base unit)
Dimensions & Weight70W × 90H × 73D mm / 220g
Operating Temperature-20°C to +60°C (no derating needed below 50°C)
Communication Interfaces4x RJ45 ports (2x EtherNet/IP, 2x Modbus TCP)
InstallationDIN rail (TS-35/7.5 or 15) – requires 20mm clearance on both sides
Where It Shines

You'll typically find these in automotive paint shops where Modbus temperature sensors feed data to EtherNet/IP safety controllers. Food processing plants use them to connect legacy weigh scales to new MES systems – one customer told us it cut their integration time by 60% versus using external gateways. It's not magic for ultra-high-speed applications (like motion control sync), but for standard I/O and HMI comms? Solid as bedrock.

D1F2A77952A7729F5FB225D562FE4249

Procurement Perks You'll Actually Care About

Let's be real – your boss cares about TCO, not specs. This module avoids $2k+ gateway costs per line, and since it's Omron-native, compatibility headaches are rare (we've seen 92% first-time success in retrofits). The 365-day warranty covers firmware bugs – critical when you're updating systems mid-shift. Oh, and it plays nice with Siemens and Rockwell networks, which matters when your plant uses mixed controllers.

Installation & Care

Mount it on standard DIN rail with 20mm breathing room – cramming it next to power supplies causes thermal throttling in humid environments. Use shielded CAT6 cables (grounded at one end) to avoid noise issues; I've seen unshielded cables cause 3am troubleshooting calls. For maintenance: blow out dust quarterly (compressed air works), check port LEDs during shift changes, and update firmware when Omron patches security flaws – they released one last quarter for Modbus TCP vulnerabilities. No calibration needed, but verify network timing monthly if you're running critical processes.

Quality You Can Trust

CE, UL 61010-1, and ISO 13849-1 certified – meets global safety bars for industrial automation. RoHS compliant (no nasty cadmium in these chips). Omron's 1-year warranty covers defects, but not "oops-I-plugged-240V-into-24V" moments. In my experience, failure rates stay below 0.8% in properly installed systems.

Ordering Notes: In-stock units ship in 1 week (max 4 weeks for custom firmware). Payment: 50% deposit, balance before shipping. We use FedEx/UPS/DHL with real-time tracking. Warranty starts from delivery date – keep those shipping labels!

Product Tags: ABB O3EX-HENF315845R2 , O3EX-HENF315845R2

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
1Yr
Business Type
Trading Company
Year Established
2014
Annual Export Value
US$2.5 Million - US$5 Million
Total Employees
51 - 100 People

Recommended Categories

Explore top categories and find suppliers for your specific needs