Home > Products > Steel Plank > Concrete Scaffolding Ladder Plank
Concrete Scaffolding Ladder Plank
- 200000 Piece / Pieces per Month
- Tianjin Xingang Port
- T/T Credit Card
Product Details
Brand Name: | Shisheng Or OEM | Place of Origin: | Tianjin, China | Model Number: | SD-18016 |
Material: | Galvanized Sheet |
Product Description
Concrete Scaffolding Ladder Plank
Applications of Concrete Scaffolding Ladder Plank in construction: | ||||
1.Concrete Scaffolding Ladder Plank is the main parts of scaffolding system which is | ||||
convenient for workers to walk on high building. | ||||
2.Stamping holes are on the scaffolding plank to resist skidding for workers. | ||||
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and moist | ||||
environment. | ||||
4. Various size of scaffolding plank could be customed. | ||||
Advantage of Concrete Scaffolding Ladder Plank for construction: | ||||
1.durable & stable | ||||
2.good bearing capacity | ||||
3.low cost, high quality | ||||
4.Excellent security function | ||||
5.easy to assemble & dismantle | ||||
6.long durability, the working life can up to 5-8 years | ||||
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |
Specifications | ||||
Name | Metal Deck /Decking /Plank /Walk Board | |||
Place of Origin | Tianjin, China (Mainland) | |||
Size | (more customized size available) | |||
Length (mm) | 1000 | 1500 | 2000 | (3000;4000) |
Width (mm) | 210 | 240 | 250 | (300;420;480;500) |
Height(mm) | 38 | 45 | 50 | |
Thickness(mm) | 1 | 1.1 | 1.2 | (1.5;1.8;2.0) |
Shape(Rib) | A.General Rib | B.V Stiffener | ||
Material | Q195-Q235 | |||
Good Market | Singapore ,Malyasia ,Middle East and Southeast Asia and all over the world | |||
Cerification | ISO9001:2008,SGS etc. | |||
Surface Finishing | pre-galvanized (Zinc Coated :60g/m2) | |||
Technique | automatic productive assembly line | |||
MOQ(Minimum Order Quantity) | pcs | |||
Payment | L/C at sight ;T/T | |||
Package | packed in bulk or in bundle. shipped by container or as client's request | |||
Production Capacity | 100000 pcs / month |
Concrete Scaffolding Ladder Plank Paper Drawing
SS Groupe Concrete Scaffolding Ladder Plank Production Process
Since 2001, we has been specialized in manufacturing scaffolding props, scaffolding pipes, kwik stage/ringlock/cuplock/frame scaffoldings, Concrete Scaffolding Ladder Plank , steel formwork parts,couplers and accessories. We have more than 16 years of production and export experience. All of our products comply with international quality standards and are greatly appreciated in a variety of markets around the world.
We have a highly experienced producing team, which maintains top level of every stage of the producing progress. Each team of workers is led by supervisor who monitors day to day works. Automated welding systems are widely used.
Today, we have customers in over 35 countries around the world. Our products are engineered for safety, strength and flexibility to meet international standards within this industry. It is important for structural engineers, scaffolding factories and formwork specialists. In terms of working processes, we have expertise in iron casting, steel forging and thread rolling. We have a complete quality control system, which guarantees the high quality of our products and makes sure all progress is made to schedule.
With all our technical knowledge and capacity, if you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients in the near future.
1. Are you a trader or manufacturer?
Manufacturer with an exporting office.
2. What's your payment terms?
TT, L/C at sight 100%, Trade Assurance.
3. What's your MOQ?
A full 20ft container.
4. What's your relative products?
Scaffolding and formwork products(Steel Prop, Steel Plank, Steel Pipe, Scaffolding Frame, Steel Formwork, Euro Formwork, Ringlock, Cuplock Scaffolding and accessories)
5. What's your history?
Our factory founded over 16 years, with more than 5 years exporting experience.
6. How about your after-sale service?
With professional team 7days and 24hours service to solve customer queries.
7. What's your main market?
Europe,Australia, South Asia, South America, Africa, Middle East etc.
8. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 3-4weeks if the goods are not in stock, it is according to quantity.
9. Could we visit your factory?
Warmly welcome visit our factory at any time, will arrange the professional team to follow up.
Business Manager: Amy Zhao
Tel:+86 (22) 83973806
Fax:+86(22) 83973806
Email: amy(@)
Skype: amyfighting3
Facebook: /amy.zhao.37853734
Tianjin Shisheng Scaffolding & Formwork Group – China Operation
Welcome visit our factory at any time!
Contact Us
- Shisheng Scaffolding & Formwork Co., Ltd.
- Pre-galvanized Construction Scaffolding Walkways
- Pre-galvanized Construction Scaffolding Walkways
- Hot Sell Q235 Steel Construction Plank Catwalk Pedal
- Tianjin Shisheng Pre-galvanized Scaffold Steel Plank
- MD-101 Tianjin Shisheng Construction Walk Through Board Plank
- MD-99 Tianjin Shisheng Construction Scaffolding Galvanized Steel Plank For Singapore
- MD-97 Tianjin Shisheng Scaffolding Galvanized Steel Shuttering Metal Plank
- MD-96 Tianjin Shisheng Building Galvanized Steel Scaffold Plank
- MD-94 Tianjin Shisheng Scaffolding Metal Steel Plank For Hot Selling
- MD-93 Tianjin Shisheng Construction Galvanized Scaffolding Walkway Steel Plank
- MD-92 Tianjin Shisheng Scaffolding Galvanized Steel Metal Plank
- MD-91 Tianjin Shisheng Pre-galvanized Concrete Outdoor Steel Plank
- MD-90 Tianjin Shisheng Metal Scaffold Pre-galvanized Walkway Metal Steel Planks
- MD-89 Tianjin Shisheng Galvanized Steel Scaffolding Construction Building Metal Plank
- MD-88 Tianjin Shisheng Perforated Scaffold Galvanized Steel Walk Plank
- MD-87 Tianjin Shisheng Ringlock Perforated Scaffolding Steel Plank
- MD-86 Tianjin Shisheng Standard Pre-galvanized Steel Plank Used For Construction
- MD-85 Tianjin Shisheng Portable Scaffold Perforated Metal Safety Steel Plank
- MD-84 Tianjin Shisheng Construction Galvanized Scaffolding Concrete Steel Plank
- MD-83 Tianjin Shisheng Walk Through Construction Plank Board
- MD-82 Tianjin Shisheng Galvanized Steel Scaffolding Catwalk
- MD-81 Tianjin Shisheng Construction Scaffold Metal Pre-Galvanized Steel Plank
- MD-80 Tianjin Shisheng Concrete Steel Pre-galvanized Metal Scaffold Plank With Hooks
- MD-79 Tianjin Shisheng Galvanized Steel Scaffold Plank
Popular Searches
Find Similar Products By Category
- Construction & Real Estate > Metal Building Materials
- Buy on GoldSupplier.com
- How to Buy
- Browse by Catagories
- Browse by Hot Regoins
- Private Sourcing Events
- Sell on GoldSupplier.com
- How to Sell
- Post Products
- Manage Products
- Manage Groups
- About
- About Us
- Link to Us
- Contact Us
- Sitemap
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
sales
Welcome to my shop! Glad to serve you!Please send your question!
Your message has exceeded the limit.
Your message has exceeded the limit.
-
-
Your inquiry content must be between 20 to 5000 characters.Send Now.
-
Please input the mailbox.
-