Home > Arts & Crafts > Promotion Gifts > Bottle Opener > Bottle Opener Parts/Beer Bottle Opener Parts/Bottle Opener Parts Manufacturer

Bottle Opener Parts/Beer Bottle Opener Parts/Bottle Opener Parts Manufacturer

Bottle Opener Parts/Beer Bottle Opener Parts/Bottle Opener Parts Manufacturer photo-1
US$ 0.35 - 0.85 MOQ: 300 Pieces
Key Specifications
Get Latest Price
Openers Type:
Bottle Openers
Metal Type:
Other, Aluminum,Stainless steel,Zinc alloy,bronze,Cast iron
Feature:
Eco-Friendly
Payment & Shipping
Payment Methods:
Port of Shipment:
HK Shenzhen Guangzhou
Delivery Detail:
Delivery time depends on order quantity.
Openers Type Bottle Openers
Metal Type Other, Aluminum,Stainless steel,Zinc alloy,bronze,Cast iron
Feature Eco-Friendly
Place of Origin Guangdong, China
Brand Name JMNY-Bottle opener parts
Model Number Bottle opener parts

Specifications

Bottle opener parts
1.Any custom design
2.Eco-friendly material
3.Quick delivery
4.Pass test and certification

Bottle opener parts/Beer bottle opener parts

  • Material: bronze, iron, aluminum, stainless steel, zinc alloy, pewter;
  • Process: die struck, die cast, photo etched, printing;
  • Logo process: cloisonne, soft cloisonne, bronze soft enamel, iron soft enamel,silkscreen/ offset printing;
  • Plating: gold, silver, nickel, chrome, satin, matte or antique finish;
  • Effect: single or double-sided, 2D or 3D effect;
  • Attachment: flat/ round type ring, lobster claw, C shape ring, swivel ring, 4 link chain, 8 figure keychain.   
Basic Information 
Item Bottle opener parts/Beer bottle opener parts
Material Iron / Brass / Copper / Bronze/ Zinc alloy/Stainless steel/Aluminum etc.
Size 1.2" W x 0.2" H x 2.75" L( custom sizes are welcome )
Design Welcome for OEM design
Color Anodic oxidation /soft enamel / synthetic enamel / hard enamel etc.
Process Stamped / Die casting
Logo Stamping/CMYK printing / silck/offset printing / laser engraving
Shape square / rectangle / roundness etc. (Customized)
Attachment

keychain/magnet/without

Plating gold /silver /nickel /brass /chrome /anti plating /misty plating /double plating 
Certification UL, EN, SGS

 

Packing & Shiping
Sample time 5-7 days
Mass production 7-8 days
Packing 1pc/ opp bag or according to customer's request
Shipping DHL, FEDEX, UPS, TNT, By Air, By Sea
Port HK, ShenZhen, GuangZhou
HS Code 7117190000
Term EX-W, FOB, CIF

 

 Bottle opener parts/Beer bottle opener parts/Bottle opener parts manufacturer 

 

 Bottle opener parts/Beer bottle opener parts/Bottle opener parts manufacturer   

 

 Shipping Approaches

Bottle opener parts/Beer bottle opener parts/Bottle opener parts manufacturer

Bottle opener parts/Beer bottle opener parts/Bottle opener parts manufacturer

 

 Factory Show

Bottle opener parts/Beer bottle opener parts/Bottle opener parts manufacturer

 

 Process Routing

 Bottle opener parts/Beer bottle opener parts/Bottle opener parts manufacturer

 Certification

 Bottle opener parts/Beer bottle opener parts/Bottle opener parts manufacturer

 How We Show Artwork

Artwork...Supplied free of charge for your approval

 

We supply free artwork to your design. This gives you a visual of your design and colours to your Bottle opener parts. once artwork has been approved we produce your Bottle opener parts from your approved design.

 

Please note if all you have is an idea and not a design we will happily draw a design for you and submit for your approval.

 

 

Please check the following once you have received artwork:

 

  • The overall design
  • Metal Colour
  • All Pantone numbers against a colour chart
  • The size of Bottle opener parts
  • Remember if something needs changing please let us know as changes to artwork are made free of charge.

 

 How To Place An Order

How to place you Bottle opener parts order

 

please feel free to contact us.

 

1. State Quantity Required

 

2. Send your design no matter however rough by email or post stating colours required, specific pantone colours available at no      extra cost

 

3. State your overall size

 

4. State your shape

 

5. State your chosen fitting on reverse 

 

6. State if you require epoxy covering Dome covering

 

7. Advise date required (state 1 week prior to actual date if possible

 

8. we then draw and proof by email you design indicating colours, shape, size etc.

 

9. we only proceed once you have confirmed artwork by email or letter

 

10. once confirmed an invoice will be sent to you and goods will be dispatched once invoice is clear. production is usually 2-3            weeks.

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2014
Factory Size
Below 1,000 square meters
Total Employees
51 - 100 People

Recommended Categories

Explore top categories and find suppliers for your specific needs