Home > Products > Industrial Aluminium Profiles > Industrial Hollow Aluminum Extrusion Profiles , Silver Anodized Aluminium Triple Parts
Industrial Hollow Aluminum Extrusion Profiles , Silver Anodized Aluminium Triple Parts
- 0 per Month
- T/T L/C D/P D/A
- 7 days
- 325 mesh 50% SiO2 43% CaO content powder shape wollastonite for ceramics application
- 2500 mesh Calcium metasilicate ore superfine powder shape wollastonite for ceramics paint
- over molding overmold
- Industrial Hollow Aluminum Extrusion Profiles , Silver Anodized Aluminium Triple Parts
- Lightweight Quadrate Aluminum Box Truss Indoor Green 16m Span 2m / 3m / 4m Length
- Customized High Precision Welding Stainless Steel Pipes / Tubes TP304N TP310S TP316L
Product Details
Brand Name: | KaiLun | Place of Origin: | China | Model Number: | KL-K5733 |
Product Description
Certification:ISO/TS16949:2009
Hollow Triple Aluminum Industrial Extrusion Profiles for Machinery Use Parts
Item Parameter:
Name: | industrial aluminum profile |
Size: | 40*30mm |
Weight: | 0.5462kg/set |
Material: | 6005, 6063, 6061, etc. |
Surface Treatment: | silver anodizing |
Aluminium product requirement:
Item Name | Aluminum Industrial Profiles |
|
Working procedure | Die designing→Die making→Extruding→Surface treatment→Cutting→CNC machining→Driling→Tapping→Packing→Shipping→After Sale Service |
|
Quality oriented | ISO 9001:2008 TS16949:2002 |
|
Documents | Mill Certificates, RoHS, Working Instructions, Inspection Instructions, Packing Instruction, PPAP(including Control Plan, PFMEA etc.), Unpacking/unloading Instructions for customers. |
|
Packing Method | 1,Standard packing:plastic sheet wrapped for each profile in order to protect the profiles' surfaces,kraft paper wrapped in bundles. |
Order,Payment and shipping terms:
Minimum Order | 1000kg per trial order.One pc of sample free of charge provided by approval and kept for future mass production inspection, delivery fees on buyer. |
Production Capacity | 36,000MT/year |
Tooling | Available |
Sample Lead time | 15-18working days include 7-10days making tooling if it's necessary. |
Production lead time | 10-20working days. |
Payment term: | Tooling:100% prepaid by wire transfer. |
Shipping Term: | FOB,CIF or others can be discussed. |
Chemical Composition:
Alloy | Chemical Composition |
|||||||||
Si | Fe | Cu | Mn | Mg | Cr | Zn | Ti | Others | Al(Min) |
|
6005 | 0.6-0.9 | 0.35 | 0.1 | 0.1 | 0.4-0.6 | 0.1 | 0.1 | 0.1 | 0.15 | rest |
6063 | 0.2-0.6 | 0.35 | 0.1 | 0.1 | 0.45-0.9 | 0.1 | 0.1 | 0.1 | 0.15 | rest |
6061 | 0.4-0.8 | 0.7 | 0.15-0.4 | 0.15 | 0.8-1.2 | 0.04-0.35 | 0.25 | 0.15 | 0.15 | rest |
Mechanical Properties