Home > Service > Design & Photography > Energy Saving Equipment FY180-Coal Rods Machine

Energy Saving Equipment FY180-Coal Rods Machine

Energy Saving Equipment FY180-Coal Rods Machine photo-1
US$ 10000 - 10000 MOQ: 1 Set
Key Specifications
Get Latest Price
Brand Name:
FUYU
Place of Origin:
China
Model Number:
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name FUYU
Place of Origin China

FY180-CoalRods Machine

  1. 1.     Workingprinciple:

Coal rods machine is a machinetool for the different shape of the powder coal. Its working principle is: themotor through the triangle belt transmission to the transmission, thetransmission output shaft through the floating coupling to push the propulsionshaft, the propulsion shaft to promote the coal feed through the forming die,and then give birth to an ideal high pressure coal rod.

  1. 2.     Structurefeatures:

  2. 1.       Thefeed screw leads to large, feed into the material quickly, and promote thesmall, the province power.

  3. 2.       Shaftblock with the use of rigid connection, high degree of resistance, anti -thrust, machine stability

  4. 3.       Theneed to seal the use of fault structure, the dirt from the fault

  5. 4.       Trianglebelt drive, smooth operation, low noise, and its overload protection

  6. 5.       Thehead and cylinder are connected with the card ring structure and the structureof the bolt.

 

  1. 3.     Installationand commissioning:

  2. 1.  The installation of spare parts must bethoroughly cleaned, removal of the transport or storage of a long time of rust,and check the parts are not damaged.

  3. 2.   Based on the diagram on the basis of concrete pouring, and concrete screw,after the solidification of the coal rod machine dipping in concrete based onscrew alignment, two concrete grouting, anchor bolts to be solidified, correctthe machine level, the machine can be stable test machine.

  4. 3.  Before the test machine will be thelubrication of lubrication, oil content is moderate. Check all the bolts ifthere is a loose phenomenon, and tighten. Point to move the machine to see ifthere is a foreign body or abnormal sound. All confirmed that no party canstart running. And check the power direction is correct.

  5. 4.  The machine idle for 3~5 minutes, then allthe normal feeding  trial, new machinefeeding should be uniform, moderate (wet and dry water generally contain12%~15%).

  1. 4.     Useand maintenance:

  2. 1.       Everyshift before the boot of the rotation is flexible; there is no abnormal sound,empty machine running 2-3 minutes to feed production.

  3. 2.       Rawmaterials must be processed , the maximum particle size of less than 3mm,adding water, adding binder, curing agent, can be used by mixing retting after24 hours.

  4. 3.       Feedthe blockage, using wood or bamboo dredge, avoid the use of metal bar.

  5. 4.       Themachine rotating part of the bearing should be the temperature is not more than60 degrees.

  6. 5.       Stopbefore stopping the material, the cylinder body material to squeeze the airdown, and the demolition of the machine head, after washing, to prepare forwork.


Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Baoji, Shaanxi, China