Home > Consumer Electronics > Hand Dryer > YTSING-YD-00080 Passed CE and ISO Roof and Wall Panel Roll Forming Machine

YTSING-YD-00080 Passed CE and ISO Roof and Wall Panel Roll Forming Machine

YTSING-YD-00080 Passed CE and ISO Roof and Wall Panel Roll Forming Machine photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
YTSING
Place of Origin:
China
Model Number:
YD-00080
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name YTSING
Place of Origin China
Model Number YD-00080
Delivery Time:Within 70 days after receiving 30% down payment
Certification:CE& ISO

Metal Trapezoid Wall Panel Roll Forming Machine

1.Packing& Delivery:

Packaging Details: Seaworthy Package
Delivery Detail: 70days
2.Specifications:

More professional, economic,high quality metal roofing and wall panel rollformers

Specification
Number of Stations 18 sets
Thickness 0.35-0.8mm
Main Power 5.5KW
Shipment Packing one 40FT container
Forming Speed 12-16mtr./min(Not include shear)
Machine Frame H-BEAM Frame
Technical Data
Productivity Roof and wall panel as the drawing
Man Power Required One operator with one assinstant
Set Up time 15 mins
Working Hours per Day 8 to 16
Line Direction Left to Right While Facing Operator Panel
Overall Machine Length Required 11.0M
Approximate Machine Height 1.6M
Complete Line Consist Of
Passive/Hydraulic Single/Double Uncoiler
Infeeding Applicator
Roll Forming Machine
Hydraulic Stop to Cut
Output Table

We can also design roof and wall panel machine according to your specific profile drawing.

3.Drawing:

4.Flow chart:

5.Pictures of the machine:

6.Packing

7.Core parts:

8.Exposition Information

9.Our company and workshop

10.Our Office and Customer :

11.Certification:

12.Gurantee and After-sale Serive:

The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

13.Contact Us:

Contact person: Lily Mobile:

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Hanzhoung, Shaanxi, China