Home > Chemicals > Silicone & Silicone Products > High Active Hydraulic Synchronous Auto Self Climbing Formwork for Engineering Bureau

High Active Hydraulic Synchronous Auto Self Climbing Formwork for Engineering Bureau

High Active Hydraulic Synchronous Auto Self Climbing Formwork for Engineering Bureau photo-1
Negotiable MOQ: 1 Kilogram (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Yunhai
Place of Origin:
China
Model Number:
ZPM-100
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name Yunhai
Place of Origin China
Model Number ZPM-100
Delivery Time:5-28days
Certification:CE,ISO,FCC

High active hydraulic synchronous Auto Self Climbing Formwork  for Engineering Bureau

Introduction

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil 

cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system

 climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best

 choice for construction of high buildings and towers.

ZPM-100  Structure Sketch

The Characteristics


1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ,  tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed. 
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and

 the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means 

saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can 

be eliminated floor by floor.  
8  Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule. 

 Project Application 

Builder:CCCC.First Highway Engineering Bureau

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Zibo, Shandong, China