Home > Industrial Equipment & Components > Welding & Soldering Supplies > Welding Helmet > Automatic Metal Roll Forming Machine With Four Roller, 2307201350 Cold Rolling Mill

Automatic Metal Roll Forming Machine With Four Roller, 2307201350 Cold Rolling Mill

Automatic Metal Roll Forming Machine With Four Roller, 2307201350 Cold Rolling Mill photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Friendship
Place of Origin:
China
Model Number:
φ230/φ720×1350
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name Friendship
Place of Origin China
Model Number φ230/φ720×1350
Delivery Time:30-60days
Certification:ISO

Automatic Metal Roll Forming Machine With Four Roller, 230×720×1350 Cold Rolling Mill

Technical parameters Material: Aluminum and aluminum alloy. Blank specification: thickness≥7mm, width≤1270mm, Max weight: 6000kg. Rolling force: P≤8000KN. Max rolling speed: V≤120m/min. Coiler tension: T≤5KN.

2. Component and parameters

a. Mainframe specifications: φ230/φ720×1350Four roller reversible cold

rolling mill.

b. Transmission way: working roller drive.

c. Press device:

    Press motor power: YZ250M-8-30KW×2.

    One Level of worm gear and worm complementary: WS300, I=41, Center

distance A=300mm.

      Two Level of worm gear and worm complementary:double enveloping worm gear surface, Center distance A=500mm, Mn=21mm, I=40.

      PressureScrew:S220×8, pressure speed: 0.045mm/s.

      Pressure box: used steel-castings.

d. Frame parts:

    Two sets closed frame, section 400×500, materials: ZG35.

    Overall processing, manual stroke.

e. Roller parts:

    Working roller×width of the roller: φ230×1350mm, Material: 9Gr2Mo

                          Bearing: FC bearing.

    Support roller×width of the roller: φ720×1300mm, Material: 9Gr2Mo

                          Bearing: FC special bearings for rolling machine.

    Bearing lubrication way: grease lubrication.

    Roller change way: hydraulic change working/ support roller.

    Support roller balance way: hydraulic.

f. Main transmission parts:

    Main motor type: Z560-3A, power: 850KW, 600/1200r/min, 440V/1930A.

    Main reducer: ZDY560.

    Gear box: center distance A= 300mm, Mn=14mm.

    Reducer lubrication way: thin oil compel lubrication.

      Transmission shaft type: industrial cross gimbal pick axis SWC265.

      Base: fission steel structure parts.

3.Coiler: hydraulic four-pyramid inflation shrinkage coiler

a. Reel specification: φ508/φ610×1400.

b. Inflation shrinkage capacity:≥20mm.

c. Hydraulic pusher, hydraulic car.

d. The largest volume weight: ≤6000kg.

e. Main Motor: Z4-355-32, 450KW, 750/1100r/min.

f. Reducer: ZL1150 type.

4. Thin oil lubrication station: responsible for reducer lubrication system

5. Coiler hydraulic system: hydraulic station control

With accumulator, electric contact pressure gauge, unloading device, relief valve, filter device, liquid level display, the system pressure to control grade functions. Pressure: 16MPa.

6. Main machine hydraulic system: hydraulic station control

With accumulator, electric contact pressure gauge, unloading device, relief valve, filter device, liquid level display, the system pressure to control grade functions. Pressure: 25MPa, working pressure: 20MPa, working roller bending force≥180KN, working roller open-degree≤15mm.

7. Processing lubrication station (user self-provided)

Thickness gauge: QNT-II type use I-Ray Thickness Gauge(user self-provided).

8. Electrical control system

a. Use eurotherm electric company original European 590 system. Relay control

system adopts PLC, tension participation. Coil diameter changes with constant tension control and implement track, with operate box, current and speed, tension, thickness of digital display, it has the function of protection.

b. By Siemens electrical appliances.

9. Wearing parts and information

a. Provide equipment instructions and control principle diagram.

b. Supply parts list provided.

10. Installation and commissioning

a. For months to advance the provision of equipment installed base map, forming the basis for the implementation of the second casting.
b. Equipment to the scene after the party responsible for the installation guide.

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Ankang, Shaanxi, China

Recommended Categories

Explore top categories and find suppliers for your specific needs