Home > Chemicals > Petrochemical Refining > 150m Height Construction Twin Mast Climbing Platform 23.8m Length 2000kg Loaded

150m Height Construction Twin Mast Climbing Platform 23.8m Length 2000kg Loaded

150m Height Construction Twin Mast Climbing Platform 23.8m Length 2000kg Loaded photo-1
Negotiable MOQ: 1 Ton (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
BYW
Place of Origin:
China
Model Number:
twin mast climbers
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name BYW
Place of Origin China
Model Number twin mast climbers
Delivery Time:30days
Certification:ISO CE

150m Height Construction Twin Mast Climbing Platform 23.8m Length 2000kgs Loaded

Description:
Twin Mast climbing platform, also called climbing type construction lifting platform, is a kind of aerial operation machinery which is driven by gear and rack, is lifted and guided by standard section. The aerial operation platform is mainly composed of the drive elements, under-frame, standard section, tripod mounting deck, rail, wall-attaching rack, electric control system and other spare parts. And this machinery possesses the following features, like without prefabricated base, large hoisting capacity, high construction efficiency, large working area and safety and reliable.

It can lift the staffs and equipment to the required height and can allow one or more person to work on the platform. It is especially suitable for the aerial glass wall construction and external wall fixture and fitting, and it is also suitable for hanging ceiling and installing wire duct.

The construction lifting platform is in stable operation and its installation is convenient, and it can be safely operated. The construction lifting platform is prevailing in the building construction; to some extent, it can replace aerial operation hanging baskets and scaffolds.

Applications:

Construction platform is a kind of more safety and bigger loaded construction tool.
Single mast construction platform can lift the staffs and equipment to the required height and can allow one or more person to work on the platform. It is especially suitable for the aerial glass wall construction and external wall fixture and fitting, and it is also suitable for hanging ceiling and installing wire duct.
The construction lifting platform is prevailing in the building construction; to some extent, it can replace aerial operation hanging baskets and scaffolds

Specifications:

Twin -Masts working platform

1. rated loaded: 2000kg

2. Max height: 150m

3. Max length of platform: 23.8m
4.Platform width: 1.25m
5.Rated speed: 8.5m/min
6.Power: 2*2*5.5kw
7.Max independent height: 8m
8: Standard section length 1508mm
9. Ties distance: 3-9m


Competitive Advantage:

BOYU(Wuxi) Technology Co., Ltd. is a professional in manufacturing, selling and leasing construction and decorative equipment, whose major products include Suspended Access Equipment, Track-style Window Cleaning Gondolas, and Mast Climbing Working Platform.
Twin -Masts working platform with 2000kg rated load, 150 max height and 8.5m/min in lifting speed. Also we can make it according to the requirement of clients.

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Qingdao, Shandong, China