Place of Origin
China
Model Number
Limited
Mineral processing equipment, processing lines, mine equipment selection, choose gold production, gold sand gold mine equipment selection, choose gold production by Jaw Crusher, Jaw Crusher, Ball Mill, classifier, mixing bucket, flotation machines, belt convey. Nissan 100-2000 tons of production design can be customized set of processes.crushing and grinding, in order to improve mineral production capacity, the potential of mining equipment, the crushing process was modified so that the grinding machine utilization factor increased, the main measures taken to implement more crushing is less wear and lower ore into the mill size. re-election re-election in the rock gold mine used widely, more as an auxiliary process in the grinding circuit to recover coarse gold, flotation and cyanidation process for the creation of favorable conditions to improve the mineral targets, raising the total recovery of gold rate, increase production and reduce costs has played an active role.