Home > Packaging & Printing > Package & Conveyance > Packaging Tubes > PE Plastic Inspection Chamber /inspection Well

PE Plastic Inspection Chamber /inspection Well

PE Plastic Inspection Chamber /inspection Well photo-1
US$ 0.1 - 0.2 MOQ: 500 Pieces
Key Specifications
Get Latest Price
Place of Origin:
Hebei, China
Brand Name:
FOSITE
Model Number:
ST
Payment & Shipping
Payment Methods:
Port of Shipment:
Tianjin port
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Hebei, China
Brand Name FOSITE
Model Number ST
Material PE
Specification 350-1200mm
Thickness 2-4mm
Standard ISO9001

Specifications

1.Material:HDPE
2.Brand name: Fosite
3.Size: 350mm, 500mm, 700mm, 1000mm, 1200mm

Specific information:

 

Plastic manhole is usually called “inspection well”, which is placed at interchange and turning point of drainage pipes, changes and plunge of caliber or slope, and in straight pipe at each certain distances. It is an affiliated drainage structure used to check, clean and dredge the pipes regularly. Our plastic manhole is made of Polymer Resin, adopts combinative structure and consists of manhole base, manhole shaft, manhole cover, cover base and concrete supported plate, etc. The critical manhole base adapts one-time molding, which can produce all types of manholes for two-way, three-way, Cross Tee 90°-165°any interchange. It uses reduce union, variable angle union and seal ring to change the connection of caliber and angle. Our manhole shaft uses PE pipe, corrugated pipe or winding pipe to adjust itself, so it is very much flexible, we can intercept the corresponding length according to the site buried length. We use rubber seal ring at the connection of manhole shaft, inlet (outlet) pipe and manhole base, so that small inner angle changes can be made. Wholesale best price high quality  HDPE Plastic inspection Well

 

HDPE plastic manhole enjoys ever-increasing use.  It is a compatible and easily-adaptable alternative to traditional concrete and/or brick construction. It reduce installation hazards, time delays and costs normally associated with manhole installation - less manpower required to move, handle and install. Typically HDPE manholes will last up to 20 times as long as concrete in high acid and chemical enviroments

 

 

PE plastic inspection chamber /inspection wellPE plastic inspection chamber /inspection wellPE plastic inspection chamber /inspection wellPE plastic inspection chamber /inspection well

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2003
Factory Size
10,000-30,000 square meters
Total Employees
11 - 50 People