Home > Manufacturing & Processing Machinery > Mining Machinery > Mining Mill > Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine photo-1
US$ 1,500 - 3,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Ball Mill
Motor Type:
AC Motor
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao Tianjin Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Ball Mill
Motor Type AC Motor
Power(W) 7.5KW
Capacity(t/h) 7 tons / 8 hours
Place of Origin Henan, China
Brand Name DRM
Model Number 1200
Dimension(L*W*H) 1200x1200x1750mm
Weight 5500KGS
Certification ISO9001:2008
Warranty 1 Year
After-sales Service Provided Engineers available to service machinery overseas

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

 

Brief Introduction of Grinding Mill Gold Roller Pan Mill Machinery

 

The two roller wet pan mill is also called wet grinding machine. Based on the different structure, it is divided into double roller grinding and three roller grinding. It is widely used for selecting ferrous metals,nonferrous metals and nonmetals, as well as precious metals like gold and silver.  

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine  

Main Advantages of Grinding Mill Gold Roller Pan Mill Machinery

 

It is praised by users because if it has the features of low investment,high production capacity,low consumption, good efficiency, easy installation and maintenance. It is the excellent equipment which can instead of ball mill. It isthe perfect equipment for medium sized and small enterprises. The wet grinding mill is mainly used for separating gold, silver, lead, zinc, iron, molybdenum, copper, antimony and so on. 

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

Working Principle of Grinding Mill Gold Roller Pan Mill Machinery

 

The machine repeatly squeeze and mill gold ore through the weight of the wheels until the gold ore has been crushed completely. And then and 1kg mercury into the water. At the same time, every 5-10 minutes, add gold ore to the machine. After 24 hours,recycle the mercury. Then pack mercury with big density of cloth. Twist the cloth and let the mercury come out. The gold will be left in the cloth. 

 

Main Structure and Features of Grinding Mill Gold Roller Pan Mill Machinery

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

 

 

Technical Parameters of Grinding Mill Gold Roller Pan Mill Machinery

 

Model

Specification

Input size(mm)

Rotate Speed (r/min)

Powder(kw)

Weight(t)

1600A

1600×400×200×500±20mm

<30mm

20-22

25KW

14.5

1500A

1500×350×200×460±20mm

20-22

22KW

13.5

1500B

1500×350×150×460±20mm

20-22

22KW

12.3

1500C

1500×300×150×420±20mm

20-22

22KW

11.3

1400A

1400×250×150×350±20mm

16-18

18.5kw

8.5

1400B

1400×250×150×350±20mm

21-23

18.5kw

8.5

1350A

1350×250×150×350±20mm

16-18

18.5kw

8

1350B

1350×250×150×350±20mm

21-23

18.5kw

8

1300A

1300×250×150×350±20mm

16-18

15kw

7.5

1300B

1300×250×150×350±20mm

21-23

15kw

7.5

1200A

1200×200×80×250±20mm

17-19

7.5kw

5.5

1200B

1200×200×80×250±20mm

23-25

7.5kw

5.5

1100A

1100×200×80×250±20mm

17-19

7.5kw

5

1100B

1100×200×80×250±20mm

23-25

7.5kw

5

1000

1000×200×80×250±20mm

13-15

5.5kw

4.5

 

1. operator should be trained qualified by manufacturers, fully understand the device structure and performance, then can take up his quarters to operate the machine. The operator should comply with the relevant safety, shift system.
2. before working, in strict accordance with the provisions add oil and maintain the proper fuel, oil line is smooth, oiling mouth is clean.
3. Check the circuit, electrical parts, wiring connectors, whether switch is securely intact. If damaged, must repair and replacement.
4. Check that whether the various parts of the machine is intact, whether the runner wheel is flexible, drive belt's degree of tightness, whether transmission parts are securely connected; after checking, boot idling for 3-5 minutes to ensure every part normal, then add ore and should be in strict accordance with specified amount, it is strictly prohibited to work overload.
5. when feeding, materials should be sieved to prevent iron ore and other hard metal debris into the mill and damage the machine.
6. when shut down for any reason, first remove the materials in the grinding pan, then restart, strictly prohibit to forced start.
7. when the device is operating, operators shall not leave, should make an inspection tour for every part working condition. If the device send out abnormal sound, runner wheel large amplitude vibration, reducer oil temperature is too high, motor's enclosure is overheating, drive belt skid, should immediately stop and dispose.
8. in shutdown process, when the grinding wheel is s not completely stopped, forbid arms and other devices into the grinding basin, prevent to hurt people, damage to the machine.
9. pelple wnter into the grinding basin to repair, in addition to disconnect power switch, put up warning sign with "someone  overhaul, not allow switch on", and set the specialist care to avoid touching.
10. after maintenance, should examine, sweep the device, remove sundries, and every switch set neutral position, then open power switch.
11. during usage, should comply with maintenance principle of regular maintenance every day, seven days little maintenance, monthly maintenance, to make the machine safety and efficient production.

 

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

 

 

Grinding Mill Gold Roller Pan Mill Machinery Edge Runner Milling Machine for Small Alluvial Gold Mine

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2004
Factory Size
1,000-3,000 square meters
Total Employees
51 - 100 People