28m ZOOMLION HGC28G Concrete Placing Boom

28m ZOOMLION HGC28G Concrete Placing Boom photo-1
Negotiable MOQ: 1 Set (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Condition:
New
Place of Origin:
Hunan, China
Brand Name:
ZOOMLION
Payment & Shipping
Payment Methods:
Port of Shipment:
any port of China
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Place of Origin Hunan, China
Brand Name ZOOMLION
Model Number HGC28G

Specifications

28m ZOOMLION HGC28G concrete placing boom
1.Max.radius of placing boom 28m
2.Total weight 19100kg
3.Tower height 22.7m

28m ZOOMLION  HGC28G concrete placing boom

 

Model

HGC28G

HGC29A

HGC29D

HGC33D

HGC32

Performance Max.radius of placing boom(m) 27.7 29 29 33 32
Tower height (to the joint between the end of the boom and swivel table)(m) 22.7 24/30 24/30 24/30 22.2
Boom articulation(·) 365
Slewing brake always close
Working temperature(°C) -20°C~48°C
Total weight(kg) 19100 19000 19000 20000 22700
Counter weight(kg) /     6300
Power 380V/50HZ
Motor Model Y2-160M-4-B35 Y2-160L-4-B35 Y2-160L-4-B35 Y2-160L-4-B35 Y2-200L-4-B35
Power(kw) 11 15 15 15 30
Safety grade IP54
Insulation grade F
Hydraulic system Pressure(Mpa) 28 33 33 33 35
Flux(l/min) 16.8 22 16.8 16.8 46
Hydraulic oil 5°C-48°CCircumstance temperature 5°C-48°C ESSO NUTO H46
-20°C-5°CCircumstance temperature -20°C-5°C ESSO NUTO H32
Control mode short—haul Control /radio remote control
Pipeline cleaning Wet cleaning/Dry cleaning
Structure of tower body Tubular column
Section of tower body (m×m) 0.75×0.75
Boom Shape Three hydraulic foldable arms Four hydraulic foldable arms
Inner diameter of pipeline DN125
End hose(″×mm) 5″×3000/4000
1st section Length(m) 10.5 10.87 10.87 14.87 8.85
Articulation -4.2°~+82.5° 0°~90° 0°~90° 0°~90° -4°~+87°
2st section Length(m) 9.2 9.57 9.57 9.57 7.62
Articulation 0°~180° 0°~180° 0°~180° 0°~180° 0°~180°
3st section Length(m) 8.0 8.56 8.56 8.56 7.74
Articulation 0°~180° 0°~180° 0°~180° 0°~180° 0°~180°
4st section Length(m) / / / / 7.79
Articulation / / / / 0°~270°
Climbing Climbing mode By hydraulic cylinder climbing
Interval of climbing(m) 0.52
Floor frame Hole prepared in floor
Shaft frame Hole prepared in floor 2.0~2.7
Min.Interval of climbing frame Climbing 3.0
Placing concrete 6.0
Rest 6.0

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2011
Factory Size
Below 1,000 square meters
Total Employees
11 - 50 People