Waste PET Bottle Washing Plant
Waste PET Bottle Washing Plant
1. Project evaluation
1.1. General information
Raw material |
Post-consumer PET bottles |
Final product & Output capacity |
PET bottle flakes / 1000kg/h |
Machine color |
Standard color: Blue and Yellow |
Description of final product |
1. Moisture: Max.1-2% 2. Bulk density: 0.3G/CM3 3. Total impurity :320ppm a-Metal content:20ppm b-PE/PP content:200ppm 4. Particle size: 14-16mm (can be designed as per special requirement) |
1.2 Work condition (provide by customer)
Warehouse/Workshop |
Construction of foundations, construction works, earthworks, and wall works; Supply of cranes, fork-lifts or other lifting equipment; Mounting materials and tools; Dimension (M*M*M): 50(L)×15(W)×7(H); About 700 square meters with height 7 meters |
Power supply |
Supply voltage: 3*380V+N+PE; Voltage tolerance: +5%/-5%; Control voltage: 24VDC+220VAC; Frequency: 50HZ+-2% |
Wire/cables/water hose: |
Wires/cables: from power supply to control cabinet of this production line and all electrical cables from control cabinet to each machine; Water hose: supply water to machines and pools; |
1.3 Energy consumption
Installation power |
350KW (Actual power consumption percentage: 80%) |
Water supply |
Consumption: 4 ton/h(Proposed water-treatment project) Pressure: 0.4Mpa |
Heat supply |
Temperature: 170°C Flow: 500kg/h Pressure: 0.7Mpa |
Ancillary staff |
9 Persons |
1.4 Main commercial terms
Project |
1000kg/hr PET bottle washing line |
Payment term |
40% as down payment by T/T; 60% by T/T before delivery and after inspection; |
Delivery time |
90 working days since the date of receiving down payment |
Packing |
Wood pallet covered by plastic film |
Warranty period |
13 months since date of bill of lading |
2 After-sales service
2.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2.2 Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. We will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer’s factory.
d. If buyer doesn’t request installation and commissioning by Seller’s engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
2.3 Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of lading
During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
3.PICTURES OF waste bottle washing plant
l Contactor: Ms. Shelley Huang
l Skype: shelley2737
l Whatsapp: +86 18602153584
l Viber: +86 18918189632
l Cell: +86 18918189632
l Web:
l Add: No. 58, New Jinqiao Road, Pudong, Shanghai, China
Standard Package for Ocean Shipping

CissCo Machinery Co., has been engineering and manufacturing a series of EXTRUDing MACHINERY for more than 20 years and has acquired an extensive expertise in the supply of manufacturing machinery; having based ourselves on the features demanded by large companies in more than 30 countries.

• We design, engineer and manufacture and customized the production line for every customer.
• Choosing the right solution: In plastics manufacturing, process is everything. We carefully evaluate each project's requirements, weigh the options and recommend the best solution for the client.
• Training & Development: we offer extensive start-up assistance, comprehensive training. As well as Engineers for training and installation at our client’s factory
• Support: We support the client in all the stages of the project life cycle, as well as the constant spare parts supply in a time efficient manner.
Send Inquiry to This Supplier
You May Also Like
-
Automatic Spice Powder Grinding Machines Salt and Peeper Grinder Nut Grinder Machine for Food ProcessingUS$ 620 - 1060MOQ: 1 Set
-
Chinese Supplier Automatic Stretch Hood and Shrink Wrapping MachineUS$ 1 - 48000MOQ: 1 Set
-
Stainless Steel 304 Beer Bottle Filling Equipment Electric 380V 50Hz 3 PhaseNegotiableMOQ: 1 Set
-
GNEYOND Protein Powder Filling and Seaming Line Milk Powder Tin Can Filling Sealing MachineNegotiableMOQ: 1 Set
-
Pyramid Tea Bag Packing Machine|Tea Sachet Packaging MachineNegotiableMOQ: 1 Set
-
China Small Beverage Bottle Wrapping Machine /juice Bottle Packing Machine/shrink Packing MachineUS$ 4,000 - 10,000MOQ: 1 Set
-
Sweet Potato Powder Grinder Dried Black Beans Grinder Purple Sweet Potato Powder Grinder for SaleUS$ 620 - 1060MOQ: 1 Set
-
Chili Powder Processing Machine Seasoning Chili Powder Making Machine Mustard Powder Grinder for SaleUS$ 620 - 1060MOQ: 1 Set
-
Cold Stretching Film Stretch Hood MachineUS$ 1 - 48000MOQ: 1 Set
-
Fully Automatic Packaging System PE Film Cold Stretch Hood Film Food Packing MachineUS$ 1 - 48000MOQ: 1 Set