Home > Manufacturing & Processing Machinery > Engineering & Construction Machinery > Pile Driver > Pv Installation Hammer Post Crawler Solar Pile Driver

Pv Installation Hammer Post Crawler Solar Pile Driver

Pv Installation Hammer Post Crawler Solar Pile Driver photo-1
Pv Installation Hammer Post Crawler Solar Pile Driver photo-2
Pv Installation Hammer Post Crawler Solar Pile Driver photo-3
Pv Installation Hammer Post Crawler Solar Pile Driver photo-4
Pv Installation Hammer Post Crawler Solar Pile Driver photo-5
Pv Installation Hammer Post Crawler Solar Pile Driver photo-6
US$ 10,000 - 25,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Efficiency:
High Efficiency pile driver
Piling Speed(m/min):
2m/min
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao Shanghai Shenzhen
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Efficiency High Efficiency pile driver
Piling Speed(m/min) 2m/min
Place of Origin Shandong, China
Brand Name Hengwang
Model Number HWF300 pile driver
Weight 8 T, 8 T
Dimension(L*W*H) 7.2*2.1*4.3 m
Certification ISO
After-sales Service Provided Engineers available to service machinery overseas
Product Description

Product Application

Pile Driver

Pile driving speed,the average 3 minutes can realize piling 6 meters deep,namely a hole 3 minutes to play.
Oil province,is a common driver uses around half of a year can be a driver left money for you.
Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.

Crawler walking,high walking and climbing ability
The frame can be moved back and forth,bit can be adjusted,high piling position accuracy.

SPECIFICATIONS FOR PILE DRIVER
Engine 
4108 Diesel Engine
Dimension
7.2*2.1*4.3 m
Weight
8T
Crawler plate width
350mm
Highest pole
4370mm
Drill diameter 
300-900mm
Maximum drilling depth
8m
Drill pipe rotation speed
71 r/min
Hydraulic system of main pump model
CBG1 - F032/032
 main pump speed 
2000-2400L/min
main pump pressure  
25Mpa
main valve flow
100 L/min
Hydraulic tank volume
260L
Rotary Angle  
360°
 performance parameters of gradability
degrees 30
Maximum speed
5 KM/h

Main Features

1.High quality round screw electric-driver

2.Big Power
3.Easy in installation and maintation.

Detailed Images

Machine Parts

Name: Solar Pile Driver

Brand: Hengwang

Original: China

high quality solar pile driver 

Main Features

Name: Solar pile driver 
Brand: Hengwang 
Original: China 
Big Horse Power Solar Pile Driver 

Machine Parts

Name: Solar Pile Driver 
Brand: Hengwang 
Original: China 
Rubber plate solar pile driver 

Main Features

Name: Drill Rod Of The Pile Driver
Brand: Hengwang
Original: China

Our Service

Pre-Sales Service

* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.

After-Sales Service

* Training how to instal the machine, training how to use the machine. 

* Engineers available to service machinery overseas.

Packing & Delivery
Packaging
Size
7.2*2.1*4.3 m
Weight
8 T



Packaging Details
standard export package

Mobile/Whatsapp:+8613608913867

Skype:3261913414@

Email:hw012@


We are professional factory will offer you best price and technical support !!

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2011
Factory Size
10,000-30,000 square meters
Total Employees
101 - 200 People