Rubber Stopper for Toilet Bathroom Chain Rubber Water Stopper
Rubber stopper for toilet bathroom chain rubber water stopper
Introduction
Custom locking rubber stopper for good selling JX40049
material:silicone/EPDM/NR/NBR/CR/VITION
lead time:7-10days
in-house workshop service.
Details
Item name |
rubber stopper |
Size |
Customized/standard and nonstandard |
Brand Name |
JIAXIN |
Material |
NBR,HNBR,EPDM,SILICONE,VITON,FLS,FFPM,PTFE |
Temperature |
Common: 20~50degree centigrade; NBR(-40~120C),ACM(-30~180C),VITON(-25~300C) |
Certificate |
CE, ROHS, PAHS, REACH |
Color |
Red,Yellow,Green,Blue,Purple, Black, White, Clear, etc |
Shape |
round,or as per your design. |
|
SPECIAL Features |
Oil-resistant; heat resistant; abrasion-resistant;aging resistant; insulation; acid and alkaline resistant; airtight; shock absorption, etc. |
Port |
Shenzhen |
Application |
agriculture,home appliance,industry,or other fields |
Delivery Time |
15 days after confirmation of the sample or according to customers’ order quantity |
Payment Term |
T/T or L/C, 30% as deposit, balance before shipment |
MOQ |
100pcs |
Package |
Polybag and carton |
Sample lead time |
7 days |
OEM/ODM |
Welcome |
- Huizhou Jiaxin Rubber Co., Ltd was established in 2003, providing rubber products including automotive industry, plumbing, household electric appliance and accessory etc.
- At present, our products are sold to U.S.A. & European market and have gotten excellent reputation.
- We have strong technical support, experienced staff and superior quality control.
- We warmly welcome all new and regular customers to inquie and visit us.
- We are right here waiting with top quality and best service.
Why choose us?
| 1 | Are you a factory or a trading company? |
| We are a manufacturer and have been in this line for more than 12 years. | |
| 2 | How can I get a sample? How long will it take? |
|
Before getting a sample, please contact us for details or charges. It will take 3~5 days approximately to ship the sample. | |
| 3 | What is your payment terms? |
|
Usually by T/T in advance. Deposit should be paid when order is confirmed, and the balance should be paid before shipment. | |
| 4 | What is the lead time for mass production? How will you ship the cargos? |
|
It'll take 7~15 days usually, based on the quantity. Cargos will be packed in standard export cartons, or follow your requirements. Then the cargos will be delivered via Air or sea. | |
| 5 | What will you do for quality control? |
|
Our QC department will strictly supervise all the processes before shipping. If the items are damaged when you receive, please contact us as soon as possible. If the problems are resulted from us, we will accept return, then arrange replacement. |
Send Inquiry to This Supplier
You May Also Like
-
Floor DrainNegotiableMOQ: 1
-
JINXIN 304 Linear Floor Drain With Tile Insert_linear Tile Insert DrainUS$ 10 - 30MOQ: 50 Pieces
-
White Plastic Basin Drain Pipe Sewer PipeUS$ 8 - 10MOQ: 1 Piece
-
Moverable PP Floor DrainUS$ 0.38 - 0.45MOQ: 1200 Pieces
-
Kitchen Bathroom Sink Drain StopperUS$ 1 - 2MOQ: 1000 Pieces
-
DC-D1810A Green Roof Outdoor Floor Drain CoverUS$ 612 - 720MOQ: 1 Carton
-
Stainless Steel Floor StrainerEUR 1 - 52MOQ: 500 Pieces
-
Suction Line P-TrapNegotiableMOQ: 1
-
Sand Cast Iron Floor DrainNegotiableMOQ: 20 Pieces
-
Investment Casting Outdoor Floor DrainUS$ 2.5 - 7.5MOQ: 500 Pieces








