Sand Die Casting Parts Details:
1). All the casting parts need precision after casting,the process of casting including sand casting and then precison casting.
2). The casting equipment: CNC milling and turning machine, Lathe, Forging hammer, drilling tapping, grinding and polishing machine, etc.
3): The casting requirement according to your casting samples or drawing.
4). Facing Method :Raw materials manufacturing, rust prevent, ting oil, spray paint, hot galvanization, cold galvanization or colored eletroplate, powder coating and so on.
5). Quality Approvals: all casting machining part are subjected to 3 phases of thorough inspection using qualified instrument before dispatching.
Table of casting material:
| Ductile iron | |
| European standard | German standard |
| EN 1563 | DIN 1693 |
| EN-GJS-350-22-LT | GGG-35.3 |
| EN-GJS-400-18-LT | GGG-40.3 |
| EN-GJS-400-15 | GGG-40 |
| EN-GJS-450-10 | |
| EN-GJS-500-7 | GGG-50 |
| EN-GJS-600-3 | GGG-60 |
| EN-GJS-700-2 | GGG-70 |
| EN-GJS-800-2 | GGG-80 |
| Compacted graphite iron | |
| Grey cast iron | |
| European standard | German standard |
| EN 1561 | DIN 1691 |
| EN-GJL-200 | GG-20 |
| EN-GJL-250 | GG-25 |
| EN-GJL-300 | GG-30 |
| EN-GJL-350 | GG-35 |
Process Flow Chart:
Our Slogan: regarding the quality as the factory's life
We are:
1. Real factory with about 20 year's history and are licensed to export, providing competitive price.
2. Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc.
3. Quality Certificates: ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL.
4. Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc.
5. Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching.
6. MOQ: 10pcs. Production capacity: 100000pcs/month
7. The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable
8. Delivery Time: about 20 days by the sea transportation.
9. The sea port of the shipment: Beilun Ningbo Zhejiang province.
Send Inquiry to This Supplier
You May Also Like
-
Weighing Booth/dispensing Booth/vertical Flow BoothNegotiableMOQ: 1 Set
-
Automatic Brick Making Machine Equipment Cement Brick Making Machinery From China Construction Compressed Brick Making MachineUS$ 399 - 1142MOQ: 1 Set
-
Tu0 C1011 C10100 C110 Pure Copper Bar Customized Industrial Seamless Good QualityNegotiableMOQ: 1 Ton
-
Large Basement Dehumidifier Commercial LaboratoryUS$ 1 - 10000MOQ: 1 Piece
-
Perkins Engine 404-22 Original Brand New 4-cylinder GN71039 24.3KW/1800CNegotiableMOQ: 1 Piece
-
Metallographic Sample Thin Section Equipment/Specimen Cutting MachineUS$ 22183.35 - 23093.07MOQ: 1 Set
-
Waste Car Radiator Crushing Separating Machine Scrap AC Radiator Recycle MachineUS$ 37865MOQ: 1 Set
-
Genyond Brand Ballpoint Pen Refill Tube Making MachineNegotiableMOQ: 1
-
Belt ChainNegotiableMOQ: 1 Set
-
15m Motorcycle Production Assembly Line Cheap MarketingNegotiableMOQ: 1



