Pitch 102 Track Link Assy Track Chain For Excavator&Bulldozer
Track Link Assy
1. Material :high quality steel
2.high-depth induction hardened track surfaces
3. for track link,ater thermal refining,then do surface treatment,to ensure th maximum strength and resistance.
4. wearlessness:for PIn,after thermal refining,then do sufface threatment,to assure the enough inside hardness and outside wearlessness.
5.cracking-resistance: for bush,ater thermal refining,then do surface treatment,to guarance the reasonable inside hardness and outsideresistance.
We can make according to customer's request,by drawing and technical
specification.
| Product name | Chinese excavator and bulldozer track link assembly |
| Warranty | 2000 hours ( Actual life is 3000 to 4000 hours) |
| Type | Dry chain or lubricated chain |
| Material | 35MnB ourchased from first-class steel plant |
Our Main Products:
Our Products Model List:
Contact:
Send Inquiry to This Supplier
You May Also Like
-
Sany Original Elbow 13741308 For Sany Truck Concrete Pump Spare PartsUS$ 55 - 61.5MOQ: 1 Unit
-
Filter Element 4120000723001 for SDLG Wheel Loader Genuine OEMNegotiableMOQ: 1 Piece
-
48-17 Excavator Spare Part for Pump Drive System YNF18405NegotiableMOQ: 1 Piece
-
Chromium Carbide Overlay Wear Plate Excavator Crusher Bucket LinerUS$ 399.69 - 399.69MOQ: 1 Square Meter
-
Engineering & Construction Machinery PartsNegotiableMOQ: 2500 Sets
-
Original MTU Engine Spare Parts 5530900261 FLAPNegotiableMOQ: 1 Bag
-
Excavator Piston Pump PC05-6 PC20 PC30 PC200-6 PC200-7 PC220 PC240 PC400 PC450 High Pressure Hydraulic Pump for KomatsuNegotiableMOQ: 1 Combo
-
Durable Model 1460A053 Fuel Injection Pump Mitsubishi High-pressure Fuel Pump 294000-1370US$ 370 - 410MOQ: 1 Unit
-
MS01 1200mm Wide Excavator Attachment Mud MucketUS$ 240 - 280MOQ: 1 Piece
-
Connector Sealing up Pipe Stop Water Hexagon Threaded Protection Hard PlugsNegotiableMOQ: 100 Pieces






