Steel Temporary Structure Work Frame Scaffolding
Steel Temporary Structure Work Frame Scaffolding
Work frame Scaffolding
| ITEM NO | DESCRIPTION | W | H |
| KS-F2001 | Work frame scaffolding | 1219mm | 1700mm |
| KS-F2002 | Work frame scaffolding | 1219mm | 1219mm |
| KS-F2003 | Work frame scaffolding | 1219mm | 914mm |
| KS-F2004 | Work frame scaffolding | 1219mm | 490mm |
| KS-F2005 | Work frame scaffolding | 762mm | 1700mm |
Work frame Scaffolding 's Main tube diameter:42mm,48mm
Main tube thickness: 1.5-2.2mm
Work frame Scaffolding 's Second tube diameter: 25mm
Second tube thickness:1.0-1.5mm
Work frame Scaffolding 's Surface: painted, powder coated and galvanized
Work frame Scaffolding 's Accessories
Work frame Scaffolding's Cutting pipe-bending-welding-surface
treatment-packaging-loading
Got a Question about Galvanized Metallic Ladder Scaffolding? We're Here to Assist you.
1. Q: What's your MOQ(minimum order quantity)?
A: 100sets work frame scaffolding
2. Q: What's your packing methods?
A: Packed in bundle, and rest in bulk.
3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. We had 10 welders which can product 1200 pcs scaffoldings one day.
6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) ,it just need 2 hours from the airport to factory
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) Adjustable props
Send Inquiry to This Supplier
You May Also Like
-
Electric Mobile ElevatorUS$ 240 - 500MOQ: 1 Combo
-
48.3mm Yellow Scaffold Fitting Tube Pole Top Bolt Caps Scaffolding End CapUS$ 0.04 - 0.08MOQ: 1 Piece
-
China Wholesale Top Selling Products 2015 Scaffolding Plastic Screw End CapsUS$ 0.02 - 0.02MOQ: 10000 Pieces
-
Stainless Steel Knuckle Joint PinUS$ 3 - 5MOQ: 1000 Pieces
-
High Quality Scaffolding System Accessories Scaffolding Steel PlankUS$ 8 - 12MOQ: 1000 Pieces
-
Non Sparking Safety Hand Tools Parallel Vice HardwareUS$ 629.93 - 2,050.18MOQ: 1 Unit
-
China Honglu Structure Steel TrestleUS$ 1,300 - 1,400MOQ: 22 Tons
-
Zinc Plated Forged Antiluce Drop Lock PinUS$ 0.2 - 0.3MOQ: 1000 Pieces
-
Swivel or Double Scaffold Quick CouplerUS$ 0.4 - 4MOQ: 1000 Pieces
-
Construction Powder Coated/Hot Dip Galvanized Mobile Guard Rail H Frame Scaffolding SetUS$ 59 - 99MOQ: 1 Set




