Wholesale Auto Spare Parts FULL WERK CV Center Yoke Assembly Spline Yoke Shaft for European Market 918523
Wholesale auto spare parts FULL WERK CV center yoke assembly spline yoke shaft for European Market 918523
Specifications
(I) Our custom c.v. centre yokes for prop shafts are precision machined for a perfect fit and casted and heat treated for maximum strength and with high quality, competitive price, prompt shipment.
(II) pls see below c.v. centre yoke catalogue.
| Series | Code | A | E | G | 4-M | D | F | C | Foreign Code | N.W(Kg) |
| 1310 | 197-288-683 | 81.7 | 59.5 | 38.1 | 5/16"-24UNF | φ44.96 | 36.53 | 68.28 | 918523 | 3.21 |
(III)Our product in drivetrain system.
drive shaft and all components. such as flange yoke, end yoke, slip yoke, H yoke, spline shaft, C.V centre yoke, weld yoke,complexing joint bearing, double-U C.V centre yoke assy, prop shaft etc
(IV)Toman Industries also engaged in in all the componets in auto brake system, steeing system and turbocharger, AC, engine flywheel etc. With years' service experience for the world's largest automotive remanufacturer , we have the confidence to make best product and service for you, my dear customer.
1.For quality control system, we have the complete supplier audit process and perfect quality team. Our SQE has audit experience of more than 400 suppliers, which gives us great confidence and ability to quickly find out the best supplier for all different needs.
2.For product inspection system, we have incoming inspection procedure and non-conformance product controlprocedure. All products have to pass the inspection before shipment to make sure no bad part is delivered to customer.
3.Standard test lab and test equipment includes CMM, Profile Projectors, MMD Series Contours, Roughness Testers, Thickness Tester, Calipers and Micrometers, Dial indicators, HBRVU Optical Hardness Machines, etc.
4.Short delivery time. We have 2500-square-meter modern stereoscopic warehouse provides a large quantity of storage, effectively reducing lead time, and relieving customer stock pressure.
5.Engineering capacity and IT ability. Reversal design ability for certain parts. ERP software, EDI interchange and Barcode management make business easy, effective and standard.
CV center yoke assembly spline yoke shaft

drive shaft
The drive shaft(s) transmit the power (torque) created by the engine to the front (front wheel drive), rear (rear wheel drive), or front and rear (four wheel drive) of the vehicle as required.
Symptoms of Wear or Failure
- Clunking when you accelerate or shift between drive and reverse
- Squeak type noise while driving
- Vibration while driving
Related Repair Advice
- The drive shaft commonly refers to the component that transmits the engine's torque from the front to the rear of the vehicle
- The drive shaft may contain flexible joints that accommodate the movement of the differential as it moves up and down with the rear suspension.
- Modification of the vehicle ride height can change the drive shaft angle. This can result in abnormal drive shaft vibration.
- A 4WD vehicle may have a front and rear drive shaft

Why Speedway?
1. Customized and designed according to the customers' sample, drawing or requirements.
2. Following the customers' requirements or as our usual packing.
3.Quick reply for Emails and messages within 24 hours
4. Customer-First, Price-Competitive, Quality- High, Services- Professional.
5. Flexible minimum order quantity
6. 20 years of rich bearing industry export experience
7. ISO & MPA & CE & SGS & BV certified
Packing detail:
each product will be packed in individual box with label of all information on it, and boxes will be packed in carton, cartons will be packed in wooden cases. Heavy parts, light parts and fragile parts will be packed separately
Delivery Detail:
30-35 days for sea order based on containers.


Q1. What is your company major products?
A: Our main products are cardan shaft, universal coupling, universal joints and center support bearing.
Q2. What is the MOQ?
A: Usually our MOQ is 5pcs/model for stock items.
Q3. What is the delivery date?
A: It takes 5~7 days if there is stock, but takes 30-45 days if there is no stock.
Q4. What is the packet?
A: Neutral packing or customer made packing.
Q5. What is the payment method?
A: Our payment method: T/T, WEST UNION, PAYPAL.
Q6.How is the quality?
A: Strict control before shipment.
Q7.What are our major market?
A: Our main markets are middle east, Africa, southeast Asia and south America, European..
Send Inquiry to This Supplier
You May Also Like
-
Fan Drive Propeller Shaft for BusNegotiableMOQ: 1
-
Bus Spare Parts Flexible Drive Shaft Propeller Shaft Made in ChinaUS$ 135 - 135MOQ: 1 Piece
-
INNER CV Joint TO-5-001 for Corona ST171US$ 13 - 15MOQ: 50 Pieces
-
C.V Joint Boot MITSUBISHI L200 MR886676 MR528709US$ 1 - 10MOQ: 100 Pieces
-
44306STXA02 Perofrmance Half Shaft Drive Shaft for HONDA PILOT 3.5L V6US$ 50 - 85MOQ: 50 Sets
-
Hot Sale Auto Spare Parts Outer cv Joint With High PerformanceUS$ 3.5 - 55MOQ: 200 Pieces
-
Spare Parts Front Right Tair Drive Shaft OEM A1644100701 For W164 ML320US$ 138 - 142MOQ: 2 Pieces
-
2015 Hot Sell Auto Parts Forging Connecting YokeUS$ 3 - 10MOQ: 1000 Units
-
TOYO Universal JointUS$ 1 - 20MOQ: 200 Pieces
-
Universal Joint for Sale 2201D5-030US$ 1 - 50MOQ: 1 Piece






