Feather Meal Produce Line

Feather Meal Produce Line photo-1
US$ 80,000 - 110,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
OEM
Model Number:
yly002
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name OEM
Model Number yly002
Condition New
After-sales Service Provided Engineers available to service machinery overseas

Specifications

feather meal produce line
1,we have done that more than 5 years
2,Professional engineers
3,with high quality and competitiv

feather meal produce line

1,we have done that more than 5 years
2,Professional engineers
3,with high quality and competitive price

 

feather meal produce line 

 

 

 Equipment advantages analysis:

1) High temperature curing tank and steam drying machine inner configuration 

electric accidentally device, can determine the temperature of the material aging; 

The jacketed layer configuration pressure gauge, determination of steam pressure, 

overpressure automatic discharge.

2) High temperature curing tank and steam drying move part, through the test motor

 running current, testing equipment, internal material quantity.

3) High temperature curing tank shaft head adopts chrome plated material, hard wear

resisting, good sealing effect.

4) The entire production process for the Danish horsley production equipment 

technology characteristics; Waste gas treatment introduce Danish technology, 

using vacuum cooling gas, the use of stainless steel inner core of cooling fin tube,

 gas cooling into wastewater, emissions to sewage treatment plant, residual 

gas through the induced draft fan pump into the spray tower in condensate treatment;

 Compared with the overall water type spray, save energy, and reduce water pollution.

5) Workshop internal use negative state environment, all gas overflow part are made 

of the stainless steel pipe, and drainage cover for drainage, the induced draft fan into 

spray tower, in order to spray deodorant processing, in order to improve the working

 environment.

6) Equipment assembly way, do raw material, finished product material does not 

fall to the ground, will not cause secondary pollution;

 

 

2.Delivery time: Within 60 days after the L/C is received.

3. Payment term: L/C at sight

5. Will supply the general technology recipes, know-how information for free .

6. Will send engineer for installation, debugging and training after-sale services.  

7. The guarantee time is 1 year and seller shall supply the spare parts and 

services at cost price after one year.

 

 

Believe we can meet your demands.

Thank you!!

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2009
Factory Size
Below 1,000 square meters
Total Employees
11 - 50 People