Shantui Bulldozer Parts SD13 Bottom Roller 10y-40-10000c

Shantui Bulldozer Parts SD13 Bottom Roller 10y-40-10000c photo-1
US$ 1 - 100 MOQ: 1 Piece
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
shantui
Model Number:
SD13
Payment & Shipping
Payment Methods:
Port of Shipment:
qingdao
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name shantui
Model Number SD13

SD13 bottom roller for bulldozer shantui spare parts 10y-40-10000c

shantui bulldozer parts SD13 bottom roller 10y-40-10000c 

Specifications

a)Premium quality standard guaranteed

b)Competitive and reasonable price

c)Long lasting and reliable working time  

 

PC200 track roller20Y-30-00016
PC300 track roller207-30-00510
D65 single track roller16Y-40-09000
D65 double track roller16Y-40-10000
D85 single track roller155-30-00124
D85 double track roller155-30-00114
D155 single track roller175-30-00486
D155 double track roller175-30-00496
D65 idler assy16Y-40-03000
D85 idler assy154-30-00291
D155 idler assy175-30-00572
D65 carrier roller16Y-40-06000
D85 carrier roller154-30-25111
D155 carrier roller175-30-00513
PC200-6/-7 tension20Y-30-12110
PC220-6/-7 tension20Y-30-02250
PC300-6/-7 tension207-30-74141
PC400-6   tension208-30-74140
track links190ML-38000
track links190ML-45000
track links190ML-47000
track links190ML-49000
D65 transmission16Y-15-00000
D85 transmission154-15-31000
D155 transmission175-15-00226

 

 

Jining Sanye Construction Machinery Co.,ltd

 

We supply OEM Replacement pins and bushings, hydraulic pumps, and common wear parts for wheel loaders, excavators and bulldozer . We ship worldwide and customer satisfaction is our number one .

 

1) Undercarriage spare parts manufactory , track shoe, track link, bolt, track roller, carrier roller, sprocket, front Idler, idler cushion…

 

2) Swing circle and related parts,swing gear, swing circle, swing machinery , moter ass'y, ring, valve, carrier …

 

3) Engine spare parts,cylinder head, cylinder block, turbocharger, piston, piston ring, metal, crankshaft, oil pump, fuel injection pump, water pump, alternator, starting motor…

 

4) Hydraulic spare parts, main valve, main pump, solenoid valve, boom/arm/bucket cylinder, final drive, travel motor, swing machinery, swing Motor…

 

5) Operator’s Cab spare parts, cab ass’y, monitor, controller, engine controller, wiring harness, seat, air conditioner, air compressor…

 

6) Work equipment,boom,boom cylinder,arm cylinder,arm,bucket cylinder,bucket,link,tooth,adapter,cutter.

 

7) Quick-wear part,pin, bushing,filter, belt, bucket lip…

 

8) Electrical system,battery ,alternator,light,cable, relay, monitor,accelerator motor ass’y,starting motor,air conditioner,controller.

 

9) Cooling system, radiator core ass’y, oil cooler ass’y, after cooler ass’y, condenser ass’y, air cooler ass’y.

 

10) Fuel tank and related parts,strainer, sensor, fuel tank, water seperator,…

 

11) bulldozer parts

 

12) Loader parts

 

……

 

 Warm Tips:

 

In order to provide exactly parts . Kindly advise us your machine brand model, part number or send parts pictures.

 

 About delivery

 

Service commitment

 

<1> Warranty

 

Q: There are so many suppliers from China, how to identify the quality?

 

A: All parts that we sell enjoy 3 to 12 months warranty; if any parts breaks during warranty, just offer us the proof. We'll resend you new one!

 

<2>Delivery

 

Q: What if parts we order from you are lost during delivery?

 

A: We'll resend the parts!

 

4.Price

 

Q: Why your price is so high?

 

A: You get what you pay for.

 

There is no winfall profits at all in the open market. We just insist resonable profits.

 

We offer genuine parts and replacement parts as your request.

 

5.Lead time

 

Q: How many days it takes before you deliver the goods to us?

 

A: We have most easily-damaged parts in stock, for small goods, we could deliver you the goods after order confirmation and receving the payment; for large quantity, we need 1 or 2 more days to order wooden box or pallet, 2-3 days to book flight/vessel and deliver the goods to named port/airport.

 

6.About us

 

<1>We have been in construction machinery field since 1995;

 

<2>Golden supplier of ALIBABA for years

 

<3>Excellent exhibitor of many famous exhibitions all over the world, CTT2012, ANKOK 2012, EXPO 2011 et

 

WEIGHT

RECOMMENDED TRANSPORT MEANS

TRANSPORT TIME

COMMENTS

<50kg

express-

3-7 days

fast

UPS/DHL/FEDEX

convenient

door to door service

expensive

50-150kg

by air

3-10 days

fast;

economic;

consignee has to do customs clearance

150>kg

by sea

10-50 days

slow;

economic;

it takes some time for customs   declarance and clearance

2x20' or 1x40'

by rail

20-35 days

slow;

economic;

it takes some time for customs   declarance and clearance;

only full container load

accepted( MOQ:2x20' or 1x40' )

 

 

 

 

 

 

 

Welcome all customers to visit our website and hope to build up a long-term  cooperation relationship with you !

We are sincerely looking forward to your enquiry ! 

If you need the product, 

 pls advise your machine brand & model, 

 or offer the Part NO. Thank you!

 

shantui bulldozer parts SD13 bottom roller 10y-40-10000c

 

shantui bulldozer parts SD13 bottom roller 10y-40-10000c

 

 

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
1999
Factory Size
3,000-5,000 square meters
Total Employees
501 - 1000 People