Home > Manufacturing & Processing Machinery > Engineering & Construction Machinery > Engineering & Construction Machinery Parts > Shantui Bulldozer SD22 Ripper Assy 154-78-10006 From China Supplier

Shantui Bulldozer SD22 Ripper Assy 154-78-10006 From China Supplier

Shantui Bulldozer SD22 Ripper Assy 154-78-10006 From China Supplier photo-1
US$ 1 - 7,000 MOQ: 1 Piece
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
shantui
Model Number:
SD22 D85
Payment & Shipping
Payment Methods:
Port of Shipment:
qingdao / shanghai / guangzhou
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name shantui
Model Number SD22 D85

We can supply shantui bulldozer SD22 ripper assy 154-78-10006.

 

1)      Swing circle and  related  parts,swing gear, swing circle, swing machinery , moter ass'y, ring, valve,  carrier …  

2)      Engine spare parts,cylinder head, cylinder block, turbocharger, piston, piston ring, metal, crankshaft, oil pump, fuel injection pump, water pump, alternator, starting motor…

3)      Hydraulic spare parts, main valve, main pump, solenoid valve, boom/arm/bucket cylinder, final drive, travel motor, swing machinery, swing Motor…

4)      Operator’s Cab spare parts, cab ass’y, monitor, controller, engine controller, wiring harness, seat, air conditioner, air compressor…

5)     Work equipment,boom,boom cylinder,arm cylinder,arm,bucket cylinder,bucket,link,tooth,adapter,cutter.

6)      Quick-wear part,pin, bushing,filter, belt, bucket lip…

7)      Electrical system,battery ,alternator,light,cable, relay, monitor,accelerator motor ass’y,starting motor,air conditioner,controller.

8)      Cooling system, radiator core ass’y, oil cooler ass’y, after cooler ass’y, condenser ass’y, air cooler ass’y.

9)    Undercarriage spare parts, track shoe, track link, bolt, track roller, carrier roller, sprocket, front Idler, idler cushion…

10) Fuel tank and related parts,strainer, sensor, fuel tank, water seperator,…

About delivery

  1. International Express: Such as DHL,TNT, FEDEX and so on.
  2. Air transportation: For goods above 45KG, it is economic choice for customers.
  3. By sea: Heavy cargo by container transport.

Service commitment

  1. We will send the goods as fast as we can to save your time.
  2. All the pictures on our web site are real images of the part itself. What you see is what you get.
  3. Goods will be packed safely and carefully.

 

<1> Warranty

Q: There are so many suppliers from China, how to identify the quality?

A: All parts that we sell enjoy 3 to 12 months warranty; if any parts breaks during warranty, just offer us the proof. We'll resend you new one!

<2>Delivery

Q: What if parts we order from you are lost during delivery?

A: We'll resend the parts!

4.Price

Q: Why your price is so high?

A: You get what you pay for.

There is no winfall profits at all in the open market. We just insist resonable profits.

We offer genuine parts and replacement parts as your request.

5.Lead time

Q: How many days it takes before you deliver the goods to us?

A: We have most easily-damaged parts in stock, for small goods, we could deliver you the goods after order confirmation and receving the payment; for large quantity, we need 1 or 2 more days to order wooden box or pallet, 2-3 days to book flight/vessel and deliver the goods to named port/airport.

6.About us

<1>We have been in construction machinery field since 1995;

<2>Golden supplier of ALIBABA for years

<3>Excellent exhibitor of many famous exhibitions all over the world, CTT2012, ANKOK 2012, EXPO 2011 etc..

shantui bulldozer SD22 ripper assy 154-78-10006 from China suppliershantui bulldozer SD22 ripper assy 154-78-10006 from China suppliershantui bulldozer SD22 ripper assy 154-78-10006 from China supplier

 

WEIGHTRECOMMENDED   TRANSPORT MEANSTRANSPORT TIMECOMMENTS
<50kgexpress-3-7   daysfast
UPS/DHL/FEDEXconvenient
door to door serviceexpensive
50-150kgby air3-10   daysfast;
economic;
consignee has to do customs clearance
150>kgby sea10-50   daysslow;
economic;
it takes some time for customs declarance and   clearance
2x20' or 1x40'by   rail20-35   daysslow;
economic;
it takes some time for customs declarance and clearance;
only full container load accepted( MOQ:2x20' or   1x40' )

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
1999
Factory Size
3,000-5,000 square meters
Total Employees
501 - 1000 People