Jining Factory D155A-3 Track Link Ass'y Track Shoe Plate
We can supply D155A-3 track link ass'y
Our company is the authorized agency of SHANTUI products, excavator parts. And we are a Chinese MANUFACTURE. Mainly produce undercarriage parts for excavators and bulldozers.
1) SWING circle and related parts,swing gear, swing circle, swing machinery , moter ass'y, ring, valve, carrier …
2) Engine spare parts,Cylinder Head, Cylinder Block, Turbocharger, Piston, Piston Ring, Metal, Crankshaft, Oil Pump, Fuel injection Pump, Water Pump, Alternator, Starting Motor…
3) Hydraulic spare parts, Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor…
4) Operator’s Cab spare parts, Cab Ass’y, Monitor, Controller, Engine Controller, Wiring Harness, Seat, Air Conditioner, Air Compressor…
5) Work equipment,BOOM,Boom cylinder,TUBE,PIN,ARM CYLINDER,ARM,Bucket Cylinder,LINK,Bucket Link,BUSHING,BUCKET,TOOTH,ADAPTER (WELDED),CUTTER…
6) Quick-wear part,Pin, bushing,Filter(OIL FILTER,FUEL FILTER,ADDITIONAL FUEL FILTER,AIR CLEANER,CORROSION ASS’Y,HYDRAULIC ELEMENT), belt, bucket lip…
7) ELECTRICAL SYSTEM,BATTERY,alternator,light,cable, RELAY, monitor,accelerator MOTOR ASS’Y, Starting Motor, AIR CONDITIONER,controller…
8) COOLING SYSTEM, RADIATOR CORE ASS’ Y, OIL COOLER ASS’ Y, AFTER COOLER ASS’Y, CONDENSER ASS’Y, AIR COOLER ASS’ Y, Radiator…
9) Undercarriage spare parts, Track shoe, Track Link, Bolt, Track roller, Carrier Roller, Sprocket, Front Idler, Idler Cushion…
10) FUEL TANK AND RELATED PARTS,STRAINER, SENSOR, fuel tank, FUEL LINES, WATER SEPARATOR,
<1> Warranty
Q: There are so many suppliers from China, how to identify the quality?
A: All parts that we sell enjoy 3 to 12 months warranty; if any parts breaks during warranty, just offer us the proof. We'll resend you new one!
<2>Delivery
Q: What if parts we order from you are lost during delivery?
A: We'll resend the parts!
4.Price
Q: Why your price is so high?
A: You get what you pay for.
There is no winfall profits at all in the open market. We just insist resonable profits.
We offer genuine parts and replacement parts as your request.
5.Lead time
Q: How many days it takes before you deliver the goods to us?
A: We have most easily-damaged parts in stock, for small goods, we could deliver you the goods after order confirmation and receving the payment; for large quantity, we need 1 or 2 more days to order wooden box or pallet, 2-3 days to book flight/vessel and deliver the goods to named port/airport.
6.About us
<1>We have been in construction machinery field since 1995;
<2>Golden supplier of ALIBABA for years
<3>Excellent exhibitor of many famous exhibitions all over the world, CTT2012, ANKOK 2012, EXPO 2011 et
WEIGHT |
RECOMMENDED TRANSPORT MEANS |
TRANSPORT TIME |
COMMENTS |
<50kg |
express- |
3-7 days |
fast |
UPS/DHL/FEDEX |
convenient |
||
door to door service |
expensive |
||
50-150kg |
by air |
3-10 days |
fast; |
economic; | |||
consignee has to do customs clearance | |||
150>kg |
by sea |
10-50 days |
slow; |
economic; | |||
it takes some time for customs declarance and clearance | |||
2x20' or 1x40' |
by rail |
20-35 days |
slow; |
economic; | |||
it takes some time for customs declarance and clearance; | |||
|
only full container load accepted( MOQ:2x20' or 1x40' ) |
We also can supply the following undercarriage parts:
| NO. | NAME | PART NO. |
| 1 | PC200 track roller | 20Y-30-00016 |
| 2 | PC300 track roller | 207-30-00510 |
| 3 | D65 single track roller | 16Y-40-09000 |
| 4 | D65 double track roller | 16Y-40-10000 |
| 5 | D85 single track roller | 155-30-00124 |
| 6 | D85 double track roller | 155-30-00114 |
| 7 | D155 single track roller | 175-30-00486 |
| 8 | D155 double track roller | 175-30-00496 |
| 9 | D65 idler assy | 16Y-40-03000 |
| 10 | D85 idler assy | 154-30-00291 |
| 11 | D155 idler assy | 175-30-00572 |
| 12 | D65 carrier roller | 16Y-40-06000 |
| 13 | D85 carrier roller | 154-30-25111 |
| 14 | D155 carrier roller | 175-30-00513 |
| 15 | PC200-6/-7 tension | 20Y-30-12110 |
| 16 | PC220-6/-7 tension | 20Y-30-02250 |
| 17 | PC300-6/-7 tension | 207-30-74141 |
| 18 | PC400-6 tension | 208-30-74140 |
| 19 | track links | 190ML-38000 |
| 20 | track links | 190ML-45000 |
| 21 | track links | 190ML-47000 |
| 22 | track links | 190ML-49000 |
| 23 | D65 transmission | 16Y-15-00000 |
| 24 | D85 transmission | 154-15-31000 |
| 25 | D155 transmission | 175-15-00226 |
If you need other spare parts, please contact with me as following information:
Send Inquiry to This Supplier
You May Also Like
-
ORIGINAL SDLG 4110000509232 Fuel Filter Element for SDLG WHEEL LOADERUS$ 5 - 8MOQ: 1 Unit
-
GT2263KLV Turbocharger Truck Engine Specific Turbocharger Part Hino Construction Vehicle TurbochargerUS$ 550 - 600MOQ: 1 Unit
-
Excavator Piston Pump PC05-6 PC20 PC30 PC200-6 PC200-7 PC220 PC240 PC400 PC450 High Pressure Hydraulic Pump for KomatsuNegotiableMOQ: 1 Combo
-
SDLG Water Separator Filter for Excavator LG936L CLX-252KR Genuine OEMNegotiableMOQ: 1 Piece
-
MS01 1200mm Wide Excavator Attachment Mud MucketUS$ 240 - 280MOQ: 1 Piece
-
2W3558 1411468 1229978 6V2406 8M5127 2796757 9L8439 1281663 380-1371 2624157 3700438 117-0159NegotiableMOQ: 1 Blade
-
For Komatsu WA600 Large Wheel Loader6.5m³ Cubic Mining Bucket (High Quality Mines)US$ 100MOQ: 1 Piece
-
Connector Sealing up Pipe Stop Water Hexagon Threaded Protection Hard PlugsNegotiableMOQ: 100 Pieces
-
Chromium Carbide Overlay Wear Plate Excavator Crusher Bucket LinerUS$ 399.69 - 399.69MOQ: 1 Square Meter
-
Original 390kw Weichai Wp13 Diesel Engine WP13G530E310 for Sany Mining Card SK80/SK90US$ 77815.12 - 80532.20MOQ: 1 Piece







