AAR 108 Wheels for Railway Rolling Stock
Package: four or five pcs in one bunch, packaged in Nylon Bag
or Wooden cases: export wooden cases with fumigation certifications
Delivery: within 45 days after order confirmed
Railteco Group(stock code:833120) was established in the year 2003, mainly engaged in design, manufacture and maintenance of railway wagons, vehicle parts, passenger coach interirors and railway equipment.
Q: Are you trading company or manufacturer ?
A: We are factory. We have production bases in Zhangjiagang, Changzhou, Suzhou and Anwei Tongling.
Q: How long is your delivery time?
A: For first batch 30 to 45 days, series batch according to customer's plan.
Q: Do you provide free design or drawings?
A: Yes, we have design ability, and we have an expert technology team for railway equipment.
Q: What is your terms of payment ?
A: T/T or L/C, we need at least 30% deposit, and balance before shipping.
If you have another question, pls feel free to contact us as below:
Send Inquiry to This Supplier
You May Also Like
-
Brake System Railway Parts Accessories Brake Cylinder Braking HoseNegotiableMOQ: 1 Piece
-
Railway Wagon Aluminum Gravity Casting Part Train PartUS$ 1 - 3MOQ: 100 Pieces
-
The Train Parts Q345D Powder Spraying PlateUS$ 2.6 - 2.8MOQ: 500 Pieces
-
Railway Train Parts Brake PadsUS$ 20 - 20MOQ: 100 Pieces
-
Train PartUS$ 0.01 - 100MOQ: 1 Piece
-
Industrial Temperature Indicator Label for Train Axle / 1 LevelUS$ 65 - 130MOQ: 30 Cases
-
Diesel-Hydraulic Power Pack for Rail TransitNegotiableMOQ: 1 Set
-
Heavy Duty Truck Semi Trailer Axles 12t BPW Wheel HubsUS$ 800 - 2000MOQ: 1 Piece
-
Rail A75NegotiableMOQ: 1000 Tonnes
-
Rail Joint Bars 4 Holes for BS75 RailUS$ 7.2 - 20.5MOQ: 1000 Pieces












