15 Bbl Two Vessels Beer Brewing Equipment
- Capacity: 1-50BBL or Customized.
- 2 Vessels:Combi-tank (Mash lauter tun and Hot water tank, Kettle Whirlpool tun ( Can be a variety of combinations ).
- Heating:by steam, by fire, by electricity, Choose one.
- Inner container: SUS304,Thickness 3mm, 2B finished.
- Outer container: SUS304, thickness 2mm, Grind arenaceous.
- Platform/ grant/ piping/ pumps( frequency control) / dual heat exchanger/ wort aeration device/ control box Temperature controller, manual valves
- Optional:steam condensing pipe /spindle station/ liquor blending system / grist hydrator / pneumatic valves & button control
The sizing and selection of a system is critical to the operational efficiency and overall profitability of a brewery. Use this information as a basic guideline to system configuration.
Calculation of Annual Production
System Size (Brewhouse Size) x Number of brews per week x 50 weeks per year = Annual Production
Example:10 Barrels (bbls) x 3 brews/week x 50 weeks/year = 1500 bbls/year
Calculation of No. of Fermenters Required
Desired Annual Production = No. of Fermenters (to meet desired annual production)
(Brewhouse Size x Vessel Cycles/year)
Sizing for a Brewpub – Example
Parameters:
“1000 barrels per year; 75% Ales, 25% Lagers”
50 brewing weeks / year
14 Day Ales / 28 Day Lagers with full fermentation in fermenters
Ales – 25 cycles / fermenter / year (50 brewing weeks / 2 week fermentation)
Lagers – 12.5 cycles / fermenter / year (50 brewing weeks / 4 week fermentation)
6 beers on tap
Calculate system size and number of fermenters
For example
3.5 barrel system 1000 barrels / year / 3.5 barrel system / 50 brewing weeks/year = 5.8 brews per week
7 barrel system 1000 barrels / year / 7 barrel system / 50 brewing weeks/year = 2.9 brews per week
10 barrel system 1000 barrels / year / 10 barrel system / 50 brewing weeks/year = 2 brews per week
15 barrel system 1000 barrels / year / 15 barrel system / 50 brewing weeks/year = 1.3 brews per week
Comment – One must look at the labor component in selecting a system size.
Most properly sized brewpubs brew 2 – 3 times per week in their first couple of years of operation.
“Brewing less than twice a week, the system may have been oversized to start with.”
“Brewing more than 3 times a week, the system may have been initially undersized.”
“For this example, either the 7 or 10 barrel system is recommended.”
Number of fermenters required
Projected: 750 bbls Ales (75%) & 250 bbls Lagers (25%)
For 7 barrel system
Ales →750 bbls / year / (7 bbls x 25 cycles/year) = 4.2 = 5 Fermenters
Lagers →250 bbls / year / (7 bbls x 12.5 cycles/year) = 2.8 = 3 Fermenters
Total →7 – 8 Fermenters to produce 750 bbls Ales and 250 bbls Lagers
For 10 barrel system
Ales → 750 bbls / year / (10 bbls x 25 cycles/year) = 3 Fermenters
Lagers → 250 bbls / year / (10 bbls x 12.5 cycles/year) = 2 Fermenters
Total →5 Fermenters to produce 750 bbls Ales and 250 bbls Lagers
Number of Serving Vessels; Equals number of desired beer styles one wishes to serve via tank to tap.
Note number of beer styles may increase through kegging and/or bottling.
System Recommendation: 10 barrel system with 5 x 10 barrel fermenters and 6 x 10 barrel serving tanks.
Selecting the 10 barrel system over the 7 barrel system has the following benefits:
-good utilization of manpower (2 brews per week)
-reduced floor space (5 fermenters vs. 8 fermenter)
-better priced / more economical (fewer fermenters)
-better expansion capabilities
-meets all system requirements
**Note: Double sized fermenters (and conditioning tanks) may half the number of vessels required to meet annual production.
**Note: All calculations assume 50 brewing weeks per year**
For further information contact the skilled staff at Huaheng Industry and they will be pleased to assist you in optimizing your brewery for productivity, performance, aesthetics, and economy.
- Full Name: Zhejiang Huaheng Industry Co., Ltd
- Founded: 1990
- Registered Offices: Fuyang, Hangzhou, P. R. China
- Main Business Activity: Design, Manufacturing of Stainless Steel Tanks for Food& Beverage, Brewery & Winery, Dairy Industry etc.
- Quality Managing System: ISO9001:2008
- Employees: about 145
- Production Area: 20.000 sqm
Any further questions or requirements, you can reach us with the contact information as following:
TEL: +86-571-2329 8092
FAX: +86-571-2329 8080
E-mail: austin# (please replace “# ” with “@”)
Skype: austine123
We are looking forward to hearing from you!
Send Inquiry to This Supplier
You May Also Like
-
Industrial Vibrating Fluidized Bed Dryer Machine for Breadcrumb Production Line Food Processing Drying EquipmentNegotiableMOQ: 1 Set
-
Professional Coffee Roaster, Coffer Roasting Machine, Coffee Roaster in ChinaNegotiableMOQ: 1 Set
-
Electric Heating Stainless Steel Yogurt Fermentation Tank4US$ 4000.00MOQ: 1 Set
-
Semi-Auto Stainless Steel Brewing Kettle With Temperature ControlNegotiableMOQ: 1 Set
-
Supply OEM/ODM Bean Sprout MachineNegotiableMOQ: 1 Piece
-
Heavy-Duty 4m High Basketball Court Fence With Anti-Climb DesignNegotiableMOQ: 1 Acre
-
Food Processing Line Soymilk Tofu Production LineNegotiableMOQ: 1
-
Almond Slivering Cutting Machine 1kw Peanut Strip Cutter MachineNegotiableMOQ: 1 Set
-
Hot Sale Multifunctional Soy Bean Sprout MachineUS$ 1,500 - 7,999MOQ: 1 Set
-
Yellow Bean Sprouts Washing Machine Cleaning MachineUS$ 1 - 2,500MOQ: 1 Set


