High Performance Manufacturer Casting Auto Parts
High performance manufacturer casting auto parts
Dear Customer:
Welcome to our website and hope our products will make you satisfied.
We think creatively,design bravely,manufacture precisely and loyalty to our
customers.
And we have our own factory.So We can produce the products according to customer requirements .
You give us a chance, we give you a surprise. Survive by quality, profit by management, development by creation. Yours, Hongsheng Foundry Co., Ltd.
1 |
Certificate |
ISO9001-2008 approved |
2 |
Material |
The materials include 201, 202, 303, 304, 304L, 316, 316L, 1Cr18Ni9Ti, 430, 440,1008,1020,20NiCrMo, 42CrMo4 and non magnetic stainless steel. |
|
We can make precision foundry products from stainless steel, carbonic steel, alloy steel, non-ferrous steel, etc. | ||
3 |
Design |
CAD design, 3D design available |
4 |
Casting equipments |
intermediate frequency furnaces, high frequency furnaces, Vacuum investment melting furnaces. |
5 |
Machining equipments |
General lathes, grinding machines, CNC lathes, CNC machine center, milling machines, cnc milling machines, planers, drilling machines, wire cutting machine |
6 |
Test equipments |
Spectrograph, Physicochemical room, Hardness Meter, Coordinate Measuring machine(CMM) |
7 |
Production lines |
1) The lost-wax casting of stainless steel and heat- resisting steel |
2) The resin sand casting of ductile iron and gray iron; | ||
|
3) Nonferrous casting with investment casting or sand casting process; | ||
4) Advanced machining center. |
Service |
OEM for 9 years |
Surface |
Satin,mirror or as required |
Size |
Customized |
MOQ |
100 pcs |
ODM& OEM |
Accept |
Sample lead time |
12days for mould, 3-7days for sample producing. |
Delivery time |
15-30 days after deposit received |
Delivery term |
By ship, by air or by express |
Payment terms |
30% deposit,and the balance before shipping;T/T,L/C,Western Union; |
Package |
Plastic bag+cartons or as per customers' request |
Our products get a good reputation from our customers in America, Canada, Germany, France, England, Japan, etc. We will provide higher quality products and better service to all our customers.
1) About delivery time
a, Sample delivery time will be 30 days. (Sample)
b, Detailed delivery time will be according to drawings & quantity. (Mass production)
2) About sample delivery
3 pcs of samples will be free.
3) About payment terms
a, Mould fee: 100% T/T in advance. (If sample would not be approved in 3 times, mould fee will be all paid back.)
b, Mass production: 30% T/T in advance, rest against copy of B/L.
Send Inquiry to This Supplier
You May Also Like
-
Kinland Truck Part 3543ZD2A-001 Air DryerNegotiableMOQ: 1 Blade
-
Thermostat Genuine 4133L507 is Suitable for Perkins 1104A Engine SeriesNegotiableMOQ: 1 Piece
-
Plastic Electrical Connector Protection Plug Sae Sma Connector Hydraulic Coupling Waterproof Plastic Dust CapNegotiableMOQ: 100 Pieces
-
1313304009 Vertebrae 95570224 ZFZL Gearbox Synchronizer Italian ZFZL Gearbox SynchronizerUS$ 196.36 - 210.38MOQ: 1 Piece
-
Storage Box Under the Central Control Screen of 24-25 Tesla Model3/y (with Silicone Pad) - Transparent VersionUS$ 10MOQ: 1 Piece
-
Auto Oil Seal Valve StemUS$ 1 - 3MOQ: 100 Pieces
-
Provide Various of Custom Car Parts Car AccessoriesUS$ 0.6 - 0.6MOQ: 200 Pieces
-
0522572 OPEL Auto Cables Auto AccessoriesNegotiableMOQ: 500 Pieces
-
Hot Sale Single End Tire Repair Valve Stem Core Remove ToolUS$ 1 - 20MOQ: 1200 Sets
-
ISO Precision Spline Tube Shaft for Truck Made in ChinaUS$ 2.1 - 10MOQ: 500 Pieces













