8m-16m personal boom lift
Boom lift 's Features:
The four wheels articulated boom lift has automated drive and hydraulic automatic leg which can be rotated 360 degrees. They can also stride across without external power supply etc, so they are widely used in highways, boat yards shopping walls, stadiums, residential property, mining workshops and any other isometric maintenance operation of complex high-altitude construction.
Application of boom lift :
Widely used in highways, boat yards shopping walls, stadiums, residential property, mining workshops and any other isometric maintenance operation of complex high-altitude construction.
Boom lift'paremeters:
| Aerial man lifts with four wheels-10m | |
| Model | GTZ-10 |
| Max. working height | 12m |
| Load capacity | 200kg |
| Lifting height | 10m |
| Color | According to your requirements |
| Overall dimension | 3800×1900×3000 mm |
| Operation | Up & down |
| Drive speed | 12-30km/h |
| Lifting speed | 0.05-0.09m/s |
| Working pressure | 10mpa |
| Rotation | 360 degree |
| Power | AC, DC or DIESEL |
| Radius of the largest operation | 3500mm |
| Self-weight | 1900kg |
Legs
With 4 full-automatic hydraulic outriggers to steady the whole machine at any kind of ground conditions.
When the road is uneven, four full-automatic legs or single leg can support the machine.
The cab:
Could be trail behind a van more conenience to transport:
Parts&Details:
Team&Custermers:
Certification&TradeAssurance:
Our service :
1. All the machines will be full tested before shipment
2. The total machine guarantee is 12 moths
3. Reply your inquiry in 24 working hours
4. Customized design is available,OEM are welcomed
5. Delivery the goods to our customer all over the world with speed and precision
6. Offer customer the lowest price with high quality lifting machine
A. Daily or refueling: Check the parts are good or bad Check hydraulic oil level and colour
B. Every 250hours or 3months: Change lubricating oil Check cylinders
C. Every 500hours or 6 months: Check tubes, pipes and value
D. Every 1000 hours or 1 year: Change hydraulic oil Grease rotation bearing and wear pads
E. Every 2000 hours or 2 years:Check hydraulic tank, lid and vent
F. Note: Maintain the chassis according to the Chassis’ Service manual
FAQ:
Delivery Time? (From 1 week to 1 month after we receive the order)
Payments? (T/T and L/C, other kinds, pls contact with us)
MOQ? (1 set)
Trade term? (FOB/CIF to your nearest seaport)
Application field? (Construction, shipyard, industrial, airport, municipal garden or others)

Send Inquiry to This Supplier
You May Also Like
-
Self-propelled Electric Scissor Lift Single and Double Work PlatformNegotiableMOQ: 1 Set
-
Customize Warehouse Industrial Stationary Hydraulic Scissor Lift Tables SkirtsNegotiableMOQ: 1
-
Electric Scissor Lift Use 10 Inch Wheel TireUS$ 16 - 200MOQ: 1 Piece
-
Chain Bucket Elevator / Plastics Sprial Bucket Elevator MachineUS$ 999 - 3,999MOQ: 1 Set
-
Alternator for Engine for Aerial Lift JLG, GENIE, SKYJACK, CONDOR, GROVE, TEREX, SNORKEL, UPRIGHT, HAULOTTEUS$ 10 - 20MOQ: 1 Piece
-
SD 42 Inches Rubber Conveyor Belt Splicing Machine 20 Minutes Fast CoolingNegotiableMOQ: 1 Set
-
Brass / Aluminum CNC Milling Machines For LED Torch , Lighting , Electrical InstrumentsNegotiableMOQ: 1 Set
-
HONDA Automotive Air Conditioning CondenserNegotiableMOQ: 1 Set
-
Shock Absorber Piston D29XD10.5X13US$ 00.20 - 0.36MOQ: 1 Set
-
Fiberglass PlatformUS$ 20 - 60MOQ: 200 Square Meters










