Home > Manufacturing & Processing Machinery > Lifting Equipment > Lifting Table > Electric Freight Elevator/hydraulic Cargo Lift/guide Rail Lift

Electric Freight Elevator/hydraulic Cargo Lift/guide Rail Lift

Electric Freight Elevator/hydraulic Cargo Lift/guide Rail Lift photo-1
Electric Freight Elevator/hydraulic Cargo Lift/guide Rail Lift photo-2
Electric Freight Elevator/hydraulic Cargo Lift/guide Rail Lift photo-3
Electric Freight Elevator/hydraulic Cargo Lift/guide Rail Lift photo-4
Electric Freight Elevator/hydraulic Cargo Lift/guide Rail Lift photo-5
US$ 4,500 - 4,500 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
True win
Model Number:
SJD
Payment & Shipping
Payment Methods:
Port of Shipment:
QINGDAO
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name True win
Model Number SJD
Lift Mechanism Telescoping Lift
Lift Drive / Actuation Hydraulic
Power 3kw
Rated Loading Capacity 2000kg
Max. Lifting Height As your need
Table Size 1500*2000mm, optional
Overall Dimensions 2.2*2.2*4m
Weight 2000kg
Certification CE ISO
Warranty 1 Year
After-sales Service Provided Overseas third-party support available

 

Product Description

                          Big capacity warehouse cargo lift with CE

 

Hydraulic warehouse cargo lift provides fast, efficient, convenient and safe access to mezzanines, balconies, basements, and any levels in multistoried building. It can be installed indoor and outdoor applications.

 Electric freight elevator/hydraulic cargo lift/guide rail lift

 

Model list of Hydraulic warehouse cargo elevator 

 

Model

Load

Platform size

Lifting height

Pit depth

Dimension

LRL 3-2.4

3T

2.0*2.0M

2.4M

300 MM

2.0*2.0*0.63M

LRL 2-5

2T

2.1*1.2M

5.0M

200 MM

2.1*1.2*0.87M

LRL 1-4.5

1T

2.1*1.5M

4.5M

200 MM

2.1*1.5*0.80M

LRL 5-6.5

5T

2.2*1.6M

6.5M

300 MM

2.2*1.6*1.28M

LRL 3-6.5        

3T          

2.2*1.9M            

6.5M                 

300 MM           

2.2*1.9*1.52M            


 

Outdoor Two-post lead rail lift:

Electric freight elevator/hydraulic cargo lift/guide rail lift

 

We can customize the lift according to your load capacity, size of platform and lifting height; just let us know your requirements.

 

 

3. Safety control of Hydraulic warehouse cargo elevator 

 

 

warehouse chain rail hydraulic lift  not only have all safety device of the traditional elevator, but also have the special safety system hereinafter.

 Electric freight elevator/hydraulic cargo lift/guide rail lift

1. Spillover valve, it can prevent high pressure when the machine moves up.

2. Manual emergency valve, it can go down to the nearest floor and open the door when you meet an emergency.

3. Manual pump: it can move up the nearest floor and open the door when you meet an emergency.

4. Pipe fracture valve, when the hydraulic system pipe fracture, it can cut down the channel of the oil to stop the falling.

5. Overload protection, when the goods on the platform is over the capacity, the overload protect device will work to stop the platform lifting up.

Project case

Electric freight elevator/hydraulic cargo lift/guide rail lift


Team&Clients:

Electric freight elevator/hydraulic cargo lift/guide rail lift

Certification&Trade assurance:

Hot sell products:

 

Electric freight elevator/hydraulic cargo lift/guide rail liftElectric freight elevator/hydraulic cargo lift/guide rail liftElectric freight elevator/hydraulic cargo lift/guide rail liftElectric freight elevator/hydraulic cargo lift/guide rail liftElectric freight elevator/hydraulic cargo lift/guide rail liftElectric freight elevator/hydraulic cargo lift/guide rail lift

FAQ

FAQ:

Delivery Time?        (From 1 week to 1 month after we receive the order)

Payments?               (T/T and L/C, other kinds, pls contact with us)

MOQ?                        (1 set)

Trade term?             (FOB/CIF to your nearest seaport)

Application field?   (Construction, shipyard, industrial, airport, municipal garden or others)

Maintenance Schedule

A. Daily or refueling: Check the parts are good or bad Check hydraulic oil level and colour
B. Every 250hours or 3months: Change lubricating oil Check cylinders
C. Every 500hours or 6 months: Check tubes, pipes and value
D. Every 1000 hours or 1 year: Change hydraulic oil Grease rotation bearing and wear pads
E. Every 2000 hours or 2 years:Check hydraulic tank, lid and vent
F. Note: Maintain the chassis according to the Chassis’ Service manual

 

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2015
Factory Size
Below 1,000 square meters
Total Employees
11 - 50 People

Recommended Categories

Explore top categories and find suppliers for your specific needs