HOT!!!Diatomaceous Mud Wall Texture Paint,wall Art Desigh
Adding texture to walls can give a room richness and depth.
|
Product name
|
Diatomite paint for wall texture |
Main Ingredients |
Pure nature diatomaceous earth, |
|
Status
|
Liquid,can use instant when open the cover |
|
Weight
|
15kgs,or 18 kgs per barrel |
|
Hazardous materials
|
Complete no,non-formaldehyde,non VOC |
|
Eco-friendly
|
Yes |
|
Key feature
|
Decompose of formaldehyde,Release negative anion,humidify adjusting,mildew resistant,air purify |
|
Color
|
Thousands color(more than 1026 colors for options),pure color,Bicolors, |
|
Wall effect can make |
1.pure color, 2.Wall texture 3.Wall patterns 4.Wall printing & stickers |
|
Functions
|
1.The Main Ingredient is pure nature diatomaceous earth,eco-friendly |
Let's see how health diatomite paint is....
Wall texture effect
The construction steps
1,Underlying Treatment
For Newly-built Wall:You have to remove the surface dusts and loose marl, gap repair timely, ensure that the wall is neat, dry , smooth and flat then polish the wall(PRO-C material series),clean the wall with water . Roll coating with GOL-S(strengthen the adhesion between bottom layer materials and the surface layer materials effectively)
For Pre-painted Wall:Eradicate the loose film on old walls, clear the surface dust and impurities, grind, clean and thorough dry the wall. polish the wall(PRO-C material series),clean the wall with water . Roll coating with GOL-S(strengthen the adhesion between bottom layer materials and the surface layer materials effectively)
2. Surface construction
Dilution: dilute with pure water, about 5%-20%,
According to actual construction process requirement to add water to dilute in order to achieve the best coating effect ,stir well before use, filter it even the better .clean the wall and dry it thoroughly, ensure the surface moisture ≤10%, PH<10,Pre-coated substrate surface must be firm, dry, clean, smooth and non-loose,color with Meter Sunshine then start to spraying or coating.
Paint system and Coating times
Paint system: Underlying
Coating times :Blue Shield(PRO-C) twice, Golden Shield(GOL-S) once
Paint system: Surface
Coating times:Meter Sunshine roll coating or spraying twice to third times
DRYING TIME (AT 25℃)
dry to touch:4h
dry through:8h
recoating: At least 8 hours interval(fully concretionary,2 days in summer,4 days in winter , appropriate extension the recoating time in wet weather )
Construction conditions:
Please don't get the cases of construction in wet or cold weather (temperature below 5℃, the relative humidity is greater than 85%), otherwise it can not achieve the desired effect of the painting.
MAINTENANCE TIME: Seven days at 25℃. In case of humid whether or the temperature is too low, the time shall be appropriately prolonged to get the best effect.
CLEAN:During the pause of the coating or after the coating is complete, please promptly clean all utensils with clear water.
STORAGE:
The product shall be stored in a shady, cool, dry, and airy place at 5-35℃. The product shall be kept airtight for storage after the can is opened.
CAUTIONS:
In Order To Obtain Reliable And Satisfactory Effect,Be Sure To Read The Method Statements On Our Product Packaging And Labeling Carefully Before Use.
Open All The Windows And Doors Before Operation, Achieve Better Ventilation Conditions.
Safety devices Must Be Worn. Especially If Your Skin Is Easy-atopic. Avoid Contact With Eyes. In Case Of Contact With Eyes, Rinse Immediately With Plenty Of Water And consult with medical personnel.
Keep Out of Reach Of Children Or Pets. The Product Should Be Stored Beyond Their Reach. In Case Of Contact With Them, Rinse Immediately With Plenty Of Water And consult with medical personnel.
Please Separate, Cover And Shelter Wooden Products And The Wall Region Effectively, In Order To Maintain Construction Site Clean, And Ensure The Best Coating Results. To Avoid Confusion In The Construction Operation, Please Apply Latex Only After Wood Paint Is Dry. Avoid confusion construction operation.
ENVIRONMENTAL PROTECTION REGULATIONS:
There is no any harmful heavy metal substance in the product. It conforms to the latest national standard of the limit of harmful substances in inside wall paints and China’s technical requirements of environmental products.
EXECUTIVE STANDARDS: GB/T9756-2009 GB18582-2008
SHELF LIFE:The valid shelf life is 12 months. See the label for the production date.
Factory Tour - Cosmi is one of the biggest factories in paint industry
Cosmi Team - We have strong service teams,to provide best products,top service is what we
committed to do
Send Inquiry to This Supplier
You May Also Like
-
Anti-static Self-leveling Epoxy Floor CoatingNegotiableMOQ: 1
-
Building CoatingNegotiableMOQ: 2700 Kilograms
-
Stainless Steel PVC Plastisol Mixer With Dual-Shaft Agitator & Temperature ControlNegotiableMOQ: 10 Sets
-
Titanium Dioxide Rutile Type 93% Used for Paint STD001 Shijiazhuang Standard ChemicalsUS$ 100 - 2000MOQ: 1 Ton
-
Aliphatic Polyurethane Paint for BuildingUS$ 1.8 - 8MOQ: 1000 Kilograms
-
Rotary Water Spray RoomNegotiableMOQ: 1 Set
-
EASY PAINTNegotiableMOQ: 2000 Pieces
-
Rubber Paint on SaleUS$ 1.45 - 35.21MOQ: 100 Pieces
-
Powder Coating EquipmentUS$ 75,000 - 950,000MOQ: 1 Set
-
Glass Car Body Coating From JapanUS$ 150,000 - 150,000MOQ: 1 Carton






