Home > Manufacturing & Processing Machinery > Woodworking Machinery > Wood Based Panel Machine > HUTOUSHI 1200T-4X8' Short Cycle Lamination Plywood Hot Press Machine

HUTOUSHI 1200T-4X8' Short Cycle Lamination Plywood Hot Press Machine

HUTOUSHI 1200T-4X8' Short Cycle Lamination Plywood Hot Press Machine photo-1
US$ 10,000 - 20,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
BSY
Model Number:
415
Payment & Shipping
Payment Methods:
Port of Shipment:
Port Qingdao Port Lianyungang
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name BSY
Model Number 415
Voltage 380/220V
Power(W) 26KW
Dimension(L*W*H) 5000x1446x5395mm
Weight 35000kgs
Certification ISO9001
Warranty 1 Year
After-sales Service Provided Engineers available to service machinery overseas
Condition New
Product Description
Name
HUTOUSHI 1200T-4X8' short cycle lamination plywood hot press machine
Quantity and diameter of the cylinder:
Ф180-320mm

2-6unit
Specification of the layers :
4*10 4*12 2*8

3*6 3*7 4*8
Thickness of the layers:
40mm-120mm
Layers distance:
100mm-200mm
Working layers: 
1-15
No-loading time:
35s
Control system:
Full automatic
Related Products
Veneer products
Veneer details
PLB
4*7,4*8,4*6,3*7,3*6
0.2-0.35mm
A,B,C,D grade
BNG
 4*8,4*7,4*6,3*7,3*6
0.2-0.35mm
A,B,C,D grade
Gurjan recon veneer
 4*8,4*7,4*6,3*7,3*6
0.2-0.35mm
A,B grade
Poplar recon veneer
 4*8,4*7,4*6,3*7,3*6
0.2-0.35mm
A,B grade
Installation


1.Seller will send 1-2 technicians to guide the equipment installation and trial run.

2.The installation duration is about 10 days.

3.Buyer should pay the service fee of $50 each day per person for seller’s technicians in the first 10 days. Buyer should pay the round trip ticket and board & lodging for seller’s technicians in buyer’s country.

4.The necessary conditions such as workshop, illumination and ventilation etc.

5.The construction of machine’s foundation support steel blocks.

6.The boiler and pipes & valves connected to the inlets/outlets of machine.

7.Hydraulic oil, thermal oil and fuel for boiler.

8.The necessary device, facilities and skilled worker for the installation and trial run.

9.Electric power, connected to main electric cabinet;

10.The necessary material such as impregnated paper, raw board etc.

11.The other relevant tools for the installation and trial run.
FAQ

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2013
Factory Size
Below 1,000 square meters
Total Employees
101 - 200 People