Green Integrated Steel Structure Prefab Homes
Specifications
1.Thermal & acoustic insulation, energy saving2.Standardized operation
3.Less labour required
4.Environmental friendly

| NO. | ITEM | TECNICAL DATA |
| 1 | galvanized steel | q235/345 |
| 2 | roof snow load | 1.55kn |
| 3 | wind load | 50m/s |
| 4 | life span of main sturcture | 70 years |
| 5 | Anti-seismic | 8 degree |
| 6 | fiber- glass thermal insulation | R19/wall |
| 7 | fiber-glass thermal insulation | R30/roof |
| 8 | window | plastic and steel/aluminium. |
1. eco-friendly
2.quick to install
3. seismic resistant
4. economical
Payment: we usually accept T/T,L/C, D/P, D/A, OA, please send email to negotiate payment term if you can not accept T/T or L/C
Delivery Time:
Design stage: 3 to 10 days after receive
LGS Frame manufacturing lead time: 15-30 days 40% deposit
Pre-assembly time: 3~7days
For urgent order, Could be faster, please send email to negotiate
How to make an order?
1. Make house design (or to choose from the design collections)
2. Manufacture the LGS steel frame, purchase other materials from cooperative-companies
3. Make pre-assembly ( if required)
4. Inspection
5.Arrange shipment
prefab villa|prefab vila| prefab villa
Send Inquiry to This Supplier
You May Also Like
-
Steel Frame House StructureUS$ 10 - 120MOQ: 1 Set
-
Quick Assembled Convenient Thermal Insulation Prefab House Casa Fabricada for Office and HotelsUS$ 900 - 1200MOQ: 18 Sets
-
Moving ToiletNegotiableMOQ: 1
-
Ware House in ChinaUS$ 1 - 9,999,999MOQ: 1 Cubic Centimeter
-
Hi-tech Prefabbricate Houses Low CostUS$ 1,000 - 50,000MOQ: 1 Set
-
16M2 New Design Prefabricated House Portable House CabinUS$ 2,500 - 4,500MOQ: 2 Sets
-
FRP Pultrusion ChannelNegotiableMOQ: 3000 Meters
-
Magic Home PorterNegotiableMOQ: 1
-
Steel Structure Metal ShedsUS$ 1,300 - 1,400MOQ: 22 Tons
-
Expanded Clay BallUS$ 60 - 160MOQ: 10 Kilograms












