Home > Lights & Lighting > LED Professional Lighting > LED PAR Light > ST-F041 4in1 Thin Par Led Guangzhou Nebula Stage Lighting Equipment

ST-F041 4in1 Thin Par Led Guangzhou Nebula Stage Lighting Equipment

ST-F041 4in1 Thin Par Led Guangzhou Nebula Stage Lighting Equipment photo-1
US$ 1 - 100 MOQ: 1 Set
Key Specifications
Get Latest Price
LED Light Source:
high power LED
Type:
Scan Lights
Input Voltage(V):
110-220
Payment & Shipping
Payment Methods:
Port of Shipment:
Guangzhou port
Delivery Detail:
Delivery time depends on order quantity.
LED Light Source high power LED
Type Scan Lights
Input Voltage(V) 110-220
Lamp Power(W) 110
Lamp Luminous Flux(lm) 12000
Lamp Luminous Efficiency(lm/w) 11000
Color Temperature(CCT) Cool White
Working Temperature(℃) 1, 45
Working Lifetime(Hour) 60000
IP Rating IP54
Certification CE
Place of Origin Guangdong, China
Brand Name Sute
Model Number ST-F041
Emitting Color RGBW

Specifications

ST-F041 4in1 thin par led guangzhou nebula stage lighting equipment
1:charming effect and long lasting

Name:4in1 thin par led guangzhou nebula stage lighting equipment

Item: ST-F041

TECHNICAL PARAMETER

 Power supply: AC110V-250V

requency: 50-60Hz
Power consumption: 110W
Light source: 7 pcs 10W high brightness 4in 1 leds
Lamp life: 6-10 ten thousand hrs
LED angel: 30(±5) degree
Color: 16.7 million kinds of color change
Control channels: 7 chs
Control mode: DMX512, master/slave, auto, sound active
Automatic model(by function button) : color change, color strobe, color dimmer,color gradual change/color jump change
Operation menu: 4 digit digital LED display
Packing size: 240*130*250mm
N.W: 2.6kg
G.W: 3kg

 

 Product Show: 

ST-F041 4in1 thin par led guangzhou nebula stage lighting equipmentST-F041 4in1 thin par led guangzhou nebula stage lighting equipmentST-F041 4in1 thin par led guangzhou nebula stage lighting equipmentST-F041 4in1 thin par led guangzhou nebula stage lighting equipmentST-F041 4in1 thin par led guangzhou nebula stage lighting equipmentST-F041 4in1 thin par led guangzhou nebula stage lighting equipment

ST-F041 4in1 thin par led guangzhou nebula stage lighting equipment 

Extra details:

We will produce your order after receiving 30% deposit and the balance should be paid before the delivery date.

 3-5 days for sample  /7-15 days for small order  /20-30 days for big order (Shipping time is not included).

 Please contact with us if you need more informations and details

 

Trade Term
Price Term EXW price
Certificate CE, RoHS
Sample Order Accept
Shipping method by express if small order, by shipping or by air if bulk order
Pay Terms T/T, Western Union,Paypal
Sample Time 2 days
Production Time 3-10 working days depend on the quantity
Packing normal case or flight case
Warranty Period 12 months

 

After service

If there is a problem with the product, the buyer need send the pictures or the videos to us firstly, we will check the problems, if can be solved by replacing parts, free parts will be shipped to you, while the shipping fees should bear by clients, or the free parts will be shipped with next discounted order.

 

 

 

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2013
Factory Size
Below 1,000 square meters
Total Employees
11 - 50 People