Turn-key Complete Production Line Water Filling
Specifications
Water Filling Machine/Mineral Water Filling Plant/Pure Water Production Line
1.gravity filling is used
2.make less noise
Water Filling Machine/Mineral Water Filling Plant/Pure Water Production Line
Production Introduction:
The high quality filling machine is used in production of non-carbonated drink of minerals and pure water packed in polyester bottles.Washing, filling and capping are integrated in the drinking water production plant.This bottled water production line is a high quality filling machine.
Production Advantages:
1.advanced technology from Italy and Germany is employed
2.the way of filling is the gravity fixed liquid surface filling
3.the whole machine is controlled by PLC with touch-screen
4.a high drgree of automatic
Product Parameter:
| Model | XGF12-12-6 | XGF18-18-6 | XGF24-24-8 | XGF32-32-8 | XGF40-40-10 | XGF50-50-12 |
| Production Capacity(500ml)b/h | 4000 | 6000 | 10000 | 14000 | 18000 | 24000 |
| Total Power(KW) | 3.58 | 4.68 | 6.58 | 9.68 | 9.68 | 10.8 |
| Bottle | PET bottle | |||||
| Bottle Shape | round or square | |||||
| Cap | screw cap | |||||
Washing
Filling
Capping
Company View
Quality Assurance
. Our company ensures that all provided goods are new, which never been used, and use the newest design and suitable materials, and at each aspect, they are line with quality, specification and function in contract.
2. Our company guarantees the mechanic function of equipment, quality and consumption index of products.
3. The guarantee period of our products is 12 months after acceptance from buyer. Within this period, we would provide free spare parts and timely as well as effective service to clients.
4. If equipments have faults that need to repair at scene, we promise that our technicians would go to clients’ factory in shortest time, and help customer debug the production line (except the force majeure)
5. After guarantee period, we would provide effective technical support, enough spare parts and excellent after-sales service to customers for life.
Installing, Debugging
1. After equipments transported into user’s workshop, user shall arrange the position of equipments according to layout.
2. Our company will send professional technicians to supervise the installing, debugging, and testing of equipments and our engineers would adjust equipments to designed index in planed time.
3. During the debugging, our company will supply some free spare parts, and fittings.
Workers’ training
1. Our company will be responsible for technical training to buyer. The training content includes structure and maintenance of equipment and equipment control and operation, ect;
2. Training can be in the buyer’s factory. Our company will send qualified technicians to teach and make corresponding training outline.
3. After training, buyer should master related operation and maintenance of equipments, and should be able to solve some common problems masterly.
Send Inquiry to This Supplier
You May Also Like
-
75%-99% Alcohol Produce PlantUS$ 15000.00MOQ: 1 Set
-
Automatic Spice Powder Grinding Machines Salt and Peeper Grinder Nut Grinder Machine for Food ProcessingUS$ 620 - 1060MOQ: 1 Set
-
Factory 800kg 1000kg Jumbo Bag Filler Concrete Cement Weighing Bulk FIBC Bag Filling Packing MachineUS$ 1 - 48000MOQ: 1 Set
-
6000BPH Aluminum Can Production Line for Beer and Carbonated Drink PackagingNegotiableMOQ: 1 Set
-
Filling MachineNegotiableMOQ: 2000 Sets
-
GNEYOND Protein Powder Filling and Seaming Line Milk Powder Tin Can Filling Sealing MachineNegotiableMOQ: 1 Set
-
Pyramid Tea Bag Packing Machine|Tea Sachet Packaging MachineNegotiableMOQ: 1 Set
-
China Small Beverage Bottle Wrapping Machine /juice Bottle Packing Machine/shrink Packing MachineUS$ 4,000 - 10,000MOQ: 1 Set
-
LCS-10/50LY Double-auger, With Weighing Bucket, Automatic Weighing Packing MachineUS$ 1 - 500MOQ: 1 Set
-
27 ALPFM-1 Curry Powder Filling Machine for SaleUS$ 1,000 - 4,000MOQ: 1 Set





