Good Fire Insulation Performance Joist Steel
Specifications
1.light weight, high strength;2.reliable quality, size accuracy;
3.easy installation;
4.less environmental pollution .
Supply C payments
The pipeline by gravity and the load transfer into building bearing structure and control pipe, restrain the pipeline vibration displacement, ensure pipeline safety operation. With pipe connections are generally classified into the tube structure, and architectural structure connections, will take root component connected the two parts of the power transmission connected component and vibration reduction component, adiabatic component, and the auxiliary steel components, constitute the hanger system. Components can be arbitrary combination.
· combined-type component, fabricated construction, neat, beautiful, generous
No welding and drilling. You can easily disassemble change adjustment, reuse, waste is minimal.
· each major coordinate and improve the indoor space elevation
Has good compatibility, each major can share a pylon; Make full use of space, can make each professional bundle to good coordination.
· stress reliable and stable
Complete design and construction, all the stress components atlas of steel and steel fastener (-- with lock serrated) can realize assembled component with no displacement, rigid connection, no order adjustment, accurate positioning. Resistance to impact and vibration, enhance shear capacity of stent node.
· GenZongShi service, in the construction field real-time guidance, uncertainty
Technicians in on-site guidance, to reassure, in the construction of the special teams met the mechanical checking real-time pylon do for each major bundle, and the coordination
· installation speed, short construction period
Install speed is the tradition of 6 ~ 8 times, manufacture and installation costs drop one half. Each professional and work can cross homework, improve working efficiency, shorten the construction period.
Later, long service life and easy maintenance
According to the use environment, customer's special demand, provide different process materials have electricity galvanized (cold galvanizing), galvanized and powder galvanized coating (pensu)
· material budget must
Indeed, semi-finished products for standardization logo of clear, cooperate with standard model of management, materials and accessories waste and lost rarely.
· perfect quality guarantee
Meet ISO9000, ISO9002 standards, guarantee the system integrity and stability of a hanger.
Send Inquiry to This Supplier
You May Also Like
-
Stainless Steel I Beam EN 10088 304 316 316L 904L Chemical Plant Support BeamUS$ 2.25 - 16.25MOQ: 100 Kilograms
-
Hot Rolled Carbon Prime Structural Steel I-Beams for Bending and Welding-High Performance Construction MaterialNegotiableMOQ: 1 Ton
-
Steel I BeamNegotiableMOQ: 2300 Tons
-
High Tensile Strength I-beams for ConstructionNegotiableMOQ: 1 Metric Ton
-
Steel Building Construction Material I BeamUS$ 1,300 - 1,400MOQ: 22 Tons
-
Structure I Steel Beams Standard Size From ChinaUS$ 500 - 700MOQ: 20 Tons
-
EN Standard Hot Rolled I-BeamsNegotiableMOQ: 27 Tons
-
IPE 220/240/300/360/450/600 HEB 260 HEA 200 Hot Rolled H Beam Structural Steel H-beam Sizes ASTMUS$ 400 - 450MOQ: 5 Tons
-
Spot Export of 20MuK I-beam SteelUS$ 580 - 630MOQ: 58 Tons
-
Prime Quality Standard Hot Rolled Steel I Beam From Factory DirectlyUS$ 500 - 700MOQ: 25 Metric Tons
