| 1. Design parameters---need to be provided: | ||
| 1) Live load on roof (KN/M2) | ||
| 2) Wind speed (KM/H) | ||
| 3) Snow load (KG/M2) - If Applicable | ||
4) Crane (if you have), Crane span, Crane lift height, max lift capacity, max wheel pressure and min wheel pressure | ||
| 5) Size: width X length X eave height, roof slope | ||
| 6) Or your idea! | ||
| BUT maybe you are unsure about what type or what needs you have regarding your warehouse/workshop, or this project is your first one. Don't worry, we will teach you to choose the right style and the finest design within your budget. | ||
| 2. Category: | ||
| (1) Simple Steel Structure Warehouse | ||
| Main structure | Single span: L -shorter than 18m, H -lower than 6m | |
| Maintenance system | Roof | Colored steel sheet with 50mm glass wool insulation |
| Wall | Colored steel sheet | |
| Door | Simple steel rolling shutter (within 10m2) | |
| Window | Very few | |
| Usage | Warehouse, workshop | |
| Standard and suitable market | Africa, Middle-East, South America (no snow, wind load below 0.4kn/m2) | |
| Send an inquiry to to get a quotation | ||
| (2) Standard Steel Structure Warehouse | ||
| Main structure | Single span: L -shorter than 24m, H -lower than 8m | |
Maintenance system | Roof | Colored steel sheet with 50mm glass wool insulation |
| Wall | Colored steel sheet or 50mm EPS sandwich board | |
| Door | Wind resistance rolling door(within 15m2) | |
| Window | Alu. Alloy (can use with skylight) | |
| Usage | Warehouse, workshop, shopping mall, exhibition hall, super market | |
| (3) Coastal (high wind speed) Steel Structure Warehouse | ||
| Main structure | Single span: L -shorter than 18m, H -lower than 6m | |
| Maintenance system | Roof | Colored steel sheet with 50mm glass wool insulation |
| Wall | Colored steel sheet or 50mm EPS sandwich board | |
| Door | Wind resistance rolling door(within 15m2) | |
| Window | Alu. Alloy (can use with skylight) | |
| Usage | Warehouse, workshop, shopping mall, exhibition hall, super market | |
| (4) Cold Region (heavy snow) Steel Structure Warehouse | ||
| Main structure | Single span: L -shorter than 18m, H -lower than 6m | |
| Maintenance system | Roof | EPS/rock wool/PU sandwich board |
| Wall | EPS/rock wool/PU sandwich board | |
| Door | PU foamed rolling door | |
| Window | Alu. Alloy, Hollow glass | |
| Usage | Warehouse, workshop, shopping mall, exhibition hall, super market | |
| Standard and suitable market | Cold regions such as Norway, Russian, North Canada, Finland, Iceland, Greenland, Sweden, etc. (snow loads below 3kn, wind load below 1KN/M2) | |
| (5) Steel Structure Warehouse with Crane (5T, 10T, 20T) | ||
| Main structure | Single span: L -shorter than 20m, H -lower than 10m | |
| Maintenance system | Roof | Colored steel sheet with 50mm glass wool insulation |
| Wall | Colored steel sheet or sandwich board | |
| Door | Wind resistance rolling door (within 15m2) | |
| Window | Alu. Alloy (can use with skylight) | |
| Usage | Warehouse, workshop | |
| Standard and suitable market | Snow 0.5kn, wind load below 0.5kn/m2 | |

| Packaging Details: | (1)Packing the pipes into the bundles by the steel strip (2)packing the welded steel structure parts by some fabric (3)packing the small parts by bags and EPS foam (4)packing sets parts by some box |
| Delivery Detail: | After deposite 30 days |
Q1: Is your company a steel mill ?
A1: No, we are a fabricator or manufacturer, using structural steel.
Q2: Where is your company location ?
A2: we are located in QingDao, Shandong, China, close to qingdao port.
Q3: What's your main process ?
A3: The main fabrication process is cutting, drilling & welding, using various section steel and plate, to achieve design drawing shapes.
Q4: What's your main products ?
A4: Our products include plug/riveted weld beam, box beam/column,all kinds of steel structure
Q5: What's your qulification ?
A5: We have passed ISO9000 quality management system certification;
Class 1 Steel Engineering Contractor Qualification, Grade A Design Qualification.
BV assessed Chinese manufacturer

Send Inquiry to This Supplier
You May Also Like
-
ZLP500 ZLP630 ZLP800 ZLP1000 Window Cleaning Platform For High-Rise BuildingNegotiableMOQ: 1
-
Rebar Springs Clamp Scaffold Beam ClampsUS$ 0.7 - 0.7MOQ: 30000 Pieces
-
China Manufacture Building Steel FrameworkUS$ 1,300 - 1,400MOQ: 22 Tons
-
Anchor Plate With Wing Nut for Tie Rod of BuildingUS$ 1 - 100MOQ: 100 Sets
-
Construction Scafollding Jack Nut Prop NutUS$ 1 - 3MOQ: 100 Pieces
-
Plastic Tie Rod ConeUS$ 3.82 - 52.3MOQ: 1 Ton
-
2014 New Design Plastic Mould Interlocking Molds Concrete Hollow Blocks Bricks MakingUS$ 5 - 10MOQ: 500 Pieces
-
Best Price Marine Plywood / Film Faced Plywood / Construction MaterialsUS$ 100 - 300MOQ: 50 Cubic Meters
-
2016 Trending Products Waterproof Timber Film Faced Plywood for ConstructionUS$ 330 - 430MOQ: 10 Pieces
-
16" TJI Floor Wooden Joist for USA Market 90x45mm Flange I JoistNegotiableMOQ: 5000 Sheets