No. | Size(mm) | Weight(kg/pc) | No. | Size(mm) | Weight(kg/pc) | |
HF9018 | 900*1800*55 | 70.89 | HA0018 | 50*50*1800 | 4.34 | |
HF9015 | 900*1500*55 | 59.47 | HA0015 | 50*50*1500 | 3.7 | |
HF9012 | 900*1200*55 | 48.03 | HA0012 | 50*50*1200 | 2.94 | |
HF6018 | 600*1800*55 | 43.1 | HE1515 | 150*150*1500 | 15.2 | |
HF6015 | 600*1500*55 | 36.3 | HE1512 | 150*150*1200 | 12.26 | |
HF6012 | 600*1200*55 | 31.7 | HE1509 | 150*150*900 | 9.34 | |
HF5018 | 500*1800*55 | 36.27 | HY1018 | 100*100*1800 | 14.56 | |
HF5015 | 500*1500*55 | 30.15 | HY1015 | 100*100*1500 | 12.29 | |
HF5012 | 500*1200*55 | 25.55 | HY1012 | 100*100*1200 | 9.72 |
Found in 1998, Qingdao Yiyu Group Co.,Ltd located in the beautiful city Qingdao, which is a major manufacturing and designing enterprise for steel formwork and steel structure.
We owns a complete steel structure manufacturing facilities. We have more than 20 senior technical personnel and more than 50 professional technicians, build a relationship
with CAS, participate in and implement research and development of national priority projects, and achieve good results.
We have passed the ISO9001 and the BV certificate. We look forward to building a longtime relationship with clients all over the world under our principle: Integrity First, Quality First, Clients First.
Q1: Is your company a steel mill ?
A1: No, we are a fabricator or manufacturer, using structural steel.
Q2: Where is your company location ?
A2: we are located in QingDao, Shandong, China, close to qingdao port.
Q3: What's your main process ?
A3: The main fabrication process is cutting, drilling & welding, using various section steel and plate, to achieve design drawing shapes.
Q4: What's your main products ?
A4: Our products include plug/riveted weld beam, box beam/column,all kinds of steel structure
Q5: What's your qulification ?
A5: We have passed ISO9000 quality management system certification;
Class 1 Steel Engineering Contractor Qualification, Grade A Design Qualification.
BV assessed Chinese manufacturer

Send Inquiry to This Supplier
You May Also Like
-
ZLP500 ZLP630 ZLP800 ZLP1000 Window Cleaning Platform For High-Rise BuildingNegotiableMOQ: 1
-
Rebar Springs Clamp Scaffold Beam ClampsUS$ 0.7 - 0.7MOQ: 30000 Pieces
-
China Manufacture Building Steel FrameworkUS$ 1,300 - 1,400MOQ: 22 Tons
-
Anchor Plate With Wing Nut for Tie Rod of BuildingUS$ 1 - 100MOQ: 100 Sets
-
Construction Scafollding Jack Nut Prop NutUS$ 1 - 3MOQ: 100 Pieces
-
Plastic Tie Rod ConeUS$ 3.82 - 52.3MOQ: 1 Ton
-
2014 New Design Plastic Mould Interlocking Molds Concrete Hollow Blocks Bricks MakingUS$ 5 - 10MOQ: 500 Pieces
-
Best Price Marine Plywood / Film Faced Plywood / Construction MaterialsUS$ 100 - 300MOQ: 50 Cubic Meters
-
2016 Trending Products Waterproof Timber Film Faced Plywood for ConstructionUS$ 330 - 430MOQ: 10 Pieces
-
16" TJI Floor Wooden Joist for USA Market 90x45mm Flange I JoistNegotiableMOQ: 5000 Sheets






